McGinnis Creek Instream Habitat Enhancement Project

Salmonid Habitat Restoration and Acquisition

Instream Habitat
Project ID1551969290171
Recovery DomainsN. CA - S. OR and CA Coast
Start Date04/10/2019
End Date04/30/2023
Year2018
StatusOngoing
Last Edited04/14/2022
 
1 - 1

Description    


The objectives of this project are to increase pool frequency, pool depth, cover, channel complexity, and floodplain connectivity through the placement of at least 100 trees in 0.75 miles of a Mattole River tributary in order to enhance spawning and rearing habitat in a stream reach with potential for steelhead, and coho and Chinook salmon. This work will occur at 16 sites, with 35 structures through the placement of large woody debris including up to 25 whole trees.

Project Benefit    


This project will increase pool frequency, pool depth, channel complexity, cover, and floodplain connectivity through the placement of at least 100 trees in 0.75 miles of a Mattole River tributary in order to enhance spawning and rearing habitat in a stream reach with potential for steelhead, and coho and Chinook salmon.

Accomplishments

Metric Completed Originally
Proposed
Instream Habitat
  Stream Miles Treated .75

Funding Details

SourceFunds
PCSRF$354,962
In-Kind Donated Labor$7,549
In-Kind Other$129,289
Report Total:$491,800


Project Map



Worksites

1551969290337    


  • Worksite Identifier: 1551969290337
  • Start Date:
  • End Date:
Area Description
Upstream extent of sites

Location Information

  • Basin: Northern California Coastal
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: California
  • Recovery Domain: N. CA - S. OR and CA Coast
  • Latitude: 40.30094
  • Longitude: -124.2132132

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding .00
    •      . . C.0.b Length of stream treated/protected
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding
      •      . . . . C.4.b Total length of instream habitat treated
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement
        •      . . . . . . C.4.d.4 Acres of streambed treated through channel structure placement
        •      . . . . . . C.4.d.5 Pools expected to be created through channel structure placement
        •      . . . . . . C.4.d.6 Yards of average stream-width at mid-point of channel structure placement project (Yards)
        •      . . . . . . C.4.d.7 Number of structures placed in channel