Entiat Instream Habitat Improvements

Salmonid Habitat Restoration and Acquisition

Instream Habitat Riparian Habitat
Project ID05-1591 R
Recovery DomainsInterior Columbia
Start Date03/01/2006
End Date06/03/2008
Year2003
StatusCompleted
Last Edited04/19/2022
 
1 - 1

Description    


The need for the Entiat Instream Habitat Improvement Project was identified by the Entiat WRIA 46 Management Plan to improve aquatic habitat in the Lower Entiat River. The project installed 5 rock barbs, two rock cross vanes, 13 logs with rootwads, 2 large wood structures, and six boulder clusters with 5 boulders each on RM 2.55-2.75 on the Lower Entiat River. Installation of these structures add instream habitat complexity by changing flow dynamics and modifying sediment deposition patterns to create pools, provide cover, and create more diverse instream conditions in the Lower Entiat River. Structure placement is also intended to reduce channel confinement and increase interaction with the riparian floodplain.

Project Benefit    


The goal of the project is to improve instream morphology and habitat in salmon bearing streams. The objective of the project is to increase instream cover, spawning, and resting areas.

Accomplishments

Metric Completed Originally
Proposed
Instream Habitat
  Stream Miles Treated .22 4.00

Funding Details

SourceFunds
PCSRF$231,203
Other$40,801
Report Total:$272,004


Project Map



Worksites

1-Entiat Instream Habitat Imp    


  • Worksite Identifier: 1-Entiat Instream Habitat Imp
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Upper Columbia
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Washington
  • Recovery Domain: Interior Columbia
  • Latitude: 47.70410675
  • Longitude: -120.32968651

ESU

  • Upper Columbia River Spring-run Chinook Salmon ESU
  • Upper Columbia River Summer- and Fall-run Chinook Salmon ESU
  • Upper Columbia River Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 272,003.72
    •      . . C.0.b Length of stream treated/protected .22
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Entiat Watershed Management Plan
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 272,002.54
      •      . . . . C.4.b Total length of instream habitat treated .22
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .22
        •      . . . . . . C.4.d.5 Pools expected to be created through channel structure placement 26
        •      . . . . . . C.4.d.7 Number of structures placed in channel 28
      •      . . . . C.4.e.1 Streambank stabilization Y (Y/N)
        •      . . . . . . C.4.e.2 Material Used For Streambank Stabilization (LOV)
        •      . . . . . . C.4.e.3 Miles of streambank stabilized .00
      •      . . C.5 Riparian Habitat ProjectY (Y/N)
        •      . . . . C.5.a Riparian Habitat Funding 1.18
        •      . . . . C.5.b.1 Total riparian miles streambank treated .00
        •      . . . . C.5.b.2 Total Riparian Acres Treated .0
        •      . . . . C.5.c.1 Riparian plantingY (Y/N)
          •      . . . . . . C.5.c.2
            Species of plants planted in riparian
            N/A
          •      . . . . . . C.5.c.3 Acres planted in riparian .0