Instream Flow Protection: Southeast - Phase 17

Salmonid Restoration Planning and Assessments

Salmonid Habitat Assessment / Inventory
Project IDAK53016_GAGE
Recovery Domains -
Start Date07/01/2020
End Date06/30/2022
Year2019
StatusCompleted
Last Edited02/27/2024
 
1 - 1

Description    


Stream gages were operated at Eva Creek, Davies Creek, Freshwater Creek, Control Creek, Luck Creek, Dangerous River, and Italio River. Streamflow measurements were taken at the following discharge stations: Freshwater Creek (two sites), Kennel Creek, Pavlof River, Luck Lake drainages (two sites), Log Jam Creek, Ratz Creek, Cowee Creek, and the Eagle River. Data from the streamgages and discharge measurement stations were imported and analyzed in the Water Information System Kisters hydrologic database. Mean daily flows were calculated from available stream gage records.



Internally, this project is identical to project AK53016_ROW; the project is split in the PCSRF database because gaging-only activities fall under the P&A category while reservation of water application submissions (which can include gaging) fall under the HP&R category. Originally, the Dangerous and Italio rivers were included as work sites under project AK53016_ROW because investigators intended to complete and submit reservations of water for both of them (providing legal protection to flows). In the end, it was decided to postpone reservations for these systems until a complete five years of data have been collected, so those work sites (and their funding) were shifted to this project.

Project Benefit    


The rivers of SE AK support some of North America’s most viable and productive salmon and steelhead fisheries. Salmon and steelhead depend on sufficient quantities of water to meet their spawning, rearing, incubation, overwintering, and migration habitat requirements. This project will benefit salmon and steelhead populations (including those used for important subsistence fisheries) throughout SE AK by procuring the data necessary to legally reserve water needed to sustain their production.

Accomplishments

Metric Completed Originally
Proposed
Planning and Assessment
  Stream Miles Assessed 38.00 28.00

Funding Details

SourceFunds
PCSRF$232,164
State$81,505
Report Total:$313,669


Project Map



Worksites

Eva Creek Gage    


  • Worksite Identifier: Eva Creek Gage
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Central Southeast Alaska (190102)
  • Subbasin: Baranof Island (19010212)
  • Watershed: Saook Bay-Frontal Peril Strait (1901021204)
  • Subwatershed: Lake Eva (190102120401)
  • State: Alaska
  • Recovery Domain:
  • Latitude: 57.405596
  • Longitude: -135.085378

ESU

  • Un-Named ESU Sockeye
  • Un-Named ESU Chum
  • Un-Named ESU Coho
  • Un-Named ESU Pink

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding 25,000.00
    •      . . B.0.b.1 Area Encompassed .0
    •      . . B.0.b.2 Stream Miles Affected
    •      . . B.2 Salmonid Habitat Assessment / InventoryY (Y/N)
      •      . . . . B.2.a Habitat Assessment Funding 25,000.00
      •      . . . . B.2.c Instream SurveyY (Y/N)
        •      . . . . . . B.2.c.1 Type of instream survey (LOV)
        •      . . . . . . B.2.c.2 Stream miles assessed 1.00
        •      . . . . . . B.2.c.3 Stream miles assessed that contained salmonids .00
        •      . . . . . . B.2.c.4 Stream miles assessed that needed restoration .00
        •      . . . . . . B.2.c.5 Stream miles assessed for regulatory actions 1.00
        •      . . . . . . B.2.c.6 Fish passage impediments identified 0

Lake Eva Station    


  • Worksite Identifier: Lake Eva Station
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Central Southeast Alaska (190102)
  • Subbasin: Baranof Island (19010212)
  • Watershed: Saook Bay-Frontal Peril Strait (1901021204)
  • Subwatershed: Lake Eva (190102120401)
  • State: Alaska
  • Recovery Domain:
  • Latitude: 57.392301
  • Longitude: -135.118138

ESU

  • Un-Named ESU Sockeye
  • Un-Named ESU Chum
  • Un-Named ESU Coho
  • Un-Named ESU Pink

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding 6,500.00
    •      . . B.0.b.1 Area Encompassed .0
    •      . . B.0.b.2 Stream Miles Affected 2.00
    •      . . B.2 Salmonid Habitat Assessment / InventoryY (Y/N)
      •      . . . . B.2.a Habitat Assessment Funding 6,500.00
      •      . . . . B.2.c Instream SurveyY (Y/N)
        •      . . . . . . B.2.c.1 Type of instream survey (LOV)
        •      . . . . . . B.2.c.2 Stream miles assessed 2.00
        •      . . . . . . B.2.c.3 Stream miles assessed that contained salmonids .00
        •      . . . . . . B.2.c.4 Stream miles assessed that needed restoration .00
        •      . . . . . . B.2.c.5 Stream miles assessed for regulatory actions 2.00
        •      . . . . . . B.2.c.6 Fish passage impediments identified 0

Freshwater Creek    


  • Worksite Identifier: Freshwater Creek
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Central Southeast Alaska (190102)
  • Subbasin: Chichagof Island (19010211)
  • Watershed: Freshwater Bay-Frontal Chatham Strait (1901021102)
  • Subwatershed: Freshwater Creek (190102110201)
  • State: Alaska
  • Recovery Domain:
  • Latitude: 57.934246
  • Longitude: -135.247749

ESU

  • Un-Named ESU Chum
  • Un-Named ESU Coho
  • Un-Named ESU Pink
  • Un-Named ESU Steelhead

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding 25,000.00
    •      . . B.0.b.1 Area Encompassed .0
    •      . . B.0.b.2 Stream Miles Affected 1.00
    •      . . B.2 Salmonid Habitat Assessment / InventoryY (Y/N)
      •      . . . . B.2.a Habitat Assessment Funding 25,000.00
      •      . . . . B.2.c Instream SurveyY (Y/N)
        •      . . . . . . B.2.c.1 Type of instream survey (LOV)
        •      . . . . . . B.2.c.2 Stream miles assessed 1.00
        •      . . . . . . B.2.c.3 Stream miles assessed that contained salmonids .00
        •      . . . . . . B.2.c.4 Stream miles assessed that needed restoration .00
        •      . . . . . . B.2.c.5 Stream miles assessed for regulatory actions 1.00
        •      . . . . . . B.2.c.6 Fish passage impediments identified 0

Freshwater Creek Station    


  • Worksite Identifier: Freshwater Creek Station
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Central Southeast Alaska (190102)
  • Subbasin: Chichagof Island (19010211)
  • Watershed: Freshwater Bay-Frontal Chatham Strait (1901021102)
  • Subwatershed: Freshwater Creek (190102110201)
  • State: Alaska
  • Recovery Domain:
  • Latitude: 57.93454
  • Longitude: -135.249501

ESU

  • Un-Named ESU Chum
  • Un-Named ESU Coho
  • Un-Named ESU Pink
  • Un-Named ESU Steelhead

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding 6,500.00
    •      . . B.0.b.1 Area Encompassed .0
    •      . . B.0.b.2 Stream Miles Affected 2.00
    •      . . B.2 Salmonid Habitat Assessment / InventoryY (Y/N)
      •      . . . . B.2.a Habitat Assessment Funding 6,500.00
      •      . . . . B.2.c Instream SurveyY (Y/N)
        •      . . . . . . B.2.c.1 Type of instream survey (LOV)
        •      . . . . . . B.2.c.2 Stream miles assessed 2.00
        •      . . . . . . B.2.c.3 Stream miles assessed that contained salmonids .00
        •      . . . . . . B.2.c.4 Stream miles assessed that needed restoration .00
        •      . . . . . . B.2.c.5 Stream miles assessed for regulatory actions 2.00
        •      . . . . . . B.2.c.6 Fish passage impediments identified 0

North Fork Freshwater Station    


  • Worksite Identifier: North Fork Freshwater Station
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Central Southeast Alaska (190102)
  • Subbasin: Chichagof Island (19010211)
  • Watershed: Freshwater Bay-Frontal Chatham Strait (1901021102)
  • Subwatershed: Freshwater Creek (190102110201)
  • State: Alaska
  • Recovery Domain:
  • Latitude: 57.954716
  • Longitude: -135.289555

ESU

  • Un-Named ESU Chum
  • Un-Named ESU Coho
  • Un-Named ESU Pink
  • Un-Named ESU Steelhead

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding 6,500.00
    •      . . B.0.b.1 Area Encompassed .0
    •      . . B.0.b.2 Stream Miles Affected 2.00
    •      . . B.2 Salmonid Habitat Assessment / InventoryY (Y/N)
      •      . . . . B.2.a Habitat Assessment Funding 6,500.00
      •      . . . . B.2.c Instream SurveyY (Y/N)
        •      . . . . . . B.2.c.1 Type of instream survey (LOV)
        •      . . . . . . B.2.c.2 Stream miles assessed 2.00
        •      . . . . . . B.2.c.3 Stream miles assessed that contained salmonids .00
        •      . . . . . . B.2.c.4 Stream miles assessed that needed restoration .00
        •      . . . . . . B.2.c.5 Stream miles assessed for regulatory actions 2.00
        •      . . . . . . B.2.c.6 Fish passage impediments identified 0

Kennel Creek Station    


  • Worksite Identifier: Kennel Creek Station
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Central Southeast Alaska (190102)
  • Subbasin: Chichagof Island (19010211)
  • Watershed: Freshwater Bay-Frontal Chatham Strait (1901021102)
  • Subwatershed: Kennel Creek (190102110203)
  • State: Alaska
  • Recovery Domain:
  • Latitude: 57.888422
  • Longitude: -135.166345

ESU

  • Un-Named ESU Chum
  • Un-Named ESU Coho
  • Un-Named ESU Pink
  • Un-Named ESU Steelhead

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding 6,500.00
    •      . . B.0.b.1 Area Encompassed .0
    •      . . B.0.b.2 Stream Miles Affected 2.00
    •      . . B.2 Salmonid Habitat Assessment / InventoryY (Y/N)
      •      . . . . B.2.a Habitat Assessment Funding 6,500.00
      •      . . . . B.2.c Instream SurveyY (Y/N)
        •      . . . . . . B.2.c.1 Type of instream survey (LOV)
        •      . . . . . . B.2.c.2 Stream miles assessed 2.00
        •      . . . . . . B.2.c.3 Stream miles assessed that contained salmonids .00
        •      . . . . . . B.2.c.4 Stream miles assessed that needed restoration .00
        •      . . . . . . B.2.c.5 Stream miles assessed for regulatory actions 2.00
        •      . . . . . . B.2.c.6 Fish passage impediments identified 0

Pavlof River Station    


  • Worksite Identifier: Pavlof River Station
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Central Southeast Alaska (190102)
  • Subbasin: Chichagof Island (19010211)
  • Watershed: Freshwater Bay-Frontal Chatham Strait (1901021102)
  • Subwatershed: Pavlof River (190102110204)
  • State: Alaska
  • Recovery Domain:
  • Latitude: 57.846452
  • Longitude: -135.162639

ESU

  • Un-Named ESU Sockeye
  • Un-Named ESU Chum
  • Un-Named ESU Coho
  • Un-Named ESU Pink

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding 6,500.00
    •      . . B.0.b.1 Area Encompassed .0
    •      . . B.0.b.2 Stream Miles Affected 2.00
    •      . . B.2 Salmonid Habitat Assessment / InventoryY (Y/N)
      •      . . . . B.2.a Habitat Assessment Funding 6,500.00
      •      . . . . B.2.c Instream SurveyY (Y/N)
        •      . . . . . . B.2.c.1 Type of instream survey (LOV)
        •      . . . . . . B.2.c.2 Stream miles assessed 2.00
        •      . . . . . . B.2.c.3 Stream miles assessed that contained salmonids .00
        •      . . . . . . B.2.c.4 Stream miles assessed that needed restoration .00
        •      . . . . . . B.2.c.5 Stream miles assessed for regulatory actions 2.00
        •      . . . . . . B.2.c.6 Fish passage impediments identified 0

Luck Creek Gage    


  • Worksite Identifier: Luck Creek Gage
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Southern Southeast Alaska (190101)
  • Subbasin: Prince of Wales (19010103)
  • Watershed: Kashevarof Passage-Frontal Clarence Strait (1901010303)
  • Subwatershed: Eagle Creek (190101030307)
  • State: Alaska
  • Recovery Domain:
  • Latitude: 55.921664
  • Longitude: -132.765246

ESU

  • Un-Named ESU Sockeye
  • Un-Named ESU Coho
  • Un-Named ESU Steelhead

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding 21,500.00
    •      . . B.0.b.1 Area Encompassed .0
    •      . . B.0.b.2 Stream Miles Affected 2.00
    •      . . B.2 Salmonid Habitat Assessment / InventoryY (Y/N)
      •      . . . . B.2.a Habitat Assessment Funding 21,500.00
      •      . . . . B.2.c Instream SurveyY (Y/N)
        •      . . . . . . B.2.c.1 Type of instream survey (LOV)
        •      . . . . . . B.2.c.2 Stream miles assessed 2.00
        •      . . . . . . B.2.c.3 Stream miles assessed that contained salmonids .00
        •      . . . . . . B.2.c.4 Stream miles assessed that needed restoration .00
        •      . . . . . . B.2.c.5 Stream miles assessed for regulatory actions 2.00
        •      . . . . . . B.2.c.6 Fish passage impediments identified 0

Upper Luck Creek Station    


  • Worksite Identifier: Upper Luck Creek Station
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Southern Southeast Alaska (190101)
  • Subbasin: Prince of Wales (19010103)
  • Watershed: Kashevarof Passage-Frontal Clarence Strait (1901010303)
  • Subwatershed: Eagle Creek (190101030307)
  • State: Alaska
  • Recovery Domain:
  • Latitude: 55.907276
  • Longitude: -132.782339

ESU

  • Un-Named ESU Sockeye
  • Un-Named ESU Coho
  • Un-Named ESU Steelhead

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding 6,500.00
    •      . . B.0.b.1 Area Encompassed .0
    •      . . B.0.b.2 Stream Miles Affected 2.00
    •      . . B.2 Salmonid Habitat Assessment / InventoryY (Y/N)
      •      . . . . B.2.a Habitat Assessment Funding 6,500.00
      •      . . . . B.2.c Instream SurveyY (Y/N)
        •      . . . . . . B.2.c.1 Type of instream survey (LOV)
        •      . . . . . . B.2.c.2 Stream miles assessed 2.00
        •      . . . . . . B.2.c.3 Stream miles assessed that contained salmonids .00
        •      . . . . . . B.2.c.4 Stream miles assessed that needed restoration .00
        •      . . . . . . B.2.c.5 Stream miles assessed for regulatory actions 2.00
        •      . . . . . . B.2.c.6 Fish passage impediments identified 0

Control Creek Gage    


  • Worksite Identifier: Control Creek Gage
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Southern Southeast Alaska (190101)
  • Subbasin: Prince of Wales (19010103)
  • Watershed: Thorne River (1901010302)
  • Subwatershed: Control Lake (190101030201)
  • State: Alaska
  • Recovery Domain:
  • Latitude: 55.7000055
  • Longitude: -132.849136

ESU

  • Un-Named ESU Sockeye
  • Un-Named ESU Coho

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding 20,000.00
    •      . . B.0.b.1 Area Encompassed .0
    •      . . B.0.b.2 Stream Miles Affected 1.00
    •      . . B.2 Salmonid Habitat Assessment / InventoryY (Y/N)
      •      . . . . B.2.a Habitat Assessment Funding 20,000.00
      •      . . . . B.2.c Instream SurveyY (Y/N)
        •      . . . . . . B.2.c.1 Type of instream survey (LOV)
        •      . . . . . . B.2.c.2 Stream miles assessed 1.00
        •      . . . . . . B.2.c.3 Stream miles assessed that contained salmonids .00
        •      . . . . . . B.2.c.4 Stream miles assessed that needed restoration .00
        •      . . . . . . B.2.c.5 Stream miles assessed for regulatory actions 1.00
        •      . . . . . . B.2.c.6 Fish passage impediments identified 0

Logjam Creek Station    


  • Worksite Identifier: Logjam Creek Station
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Southern Southeast Alaska (190101)
  • Subbasin: Prince of Wales (19010103)
  • Watershed: Logjam Creek (1901010301)
  • Subwatershed: Logjam Creek (190101030101)
  • State: Alaska
  • Recovery Domain:
  • Latitude: 55.905517
  • Longitude: -133.007972

ESU

  • Un-Named ESU Chum
  • Un-Named ESU Coho
  • Un-Named ESU Pink

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding 6,500.00
    •      . . B.0.b.1 Area Encompassed .0
    •      . . B.0.b.2 Stream Miles Affected 3.00
    •      . . B.2 Salmonid Habitat Assessment / InventoryY (Y/N)
      •      . . . . B.2.a Habitat Assessment Funding 6,500.00
      •      . . . . B.2.c Instream SurveyY (Y/N)
        •      . . . . . . B.2.c.1 Type of instream survey (LOV)
        •      . . . . . . B.2.c.2 Stream miles assessed 3.00
        •      . . . . . . B.2.c.3 Stream miles assessed that contained salmonids .00
        •      . . . . . . B.2.c.4 Stream miles assessed that needed restoration .00
        •      . . . . . . B.2.c.5 Stream miles assessed for regulatory actions 3.00
        •      . . . . . . B.2.c.6 Fish passage impediments identified 0

Ratz Creek Station    


  • Worksite Identifier: Ratz Creek Station
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Southern Southeast Alaska (190101)
  • Subbasin: Prince of Wales (19010103)
  • Watershed: Kashevarof Passage-Frontal Clarence Strait (1901010303)
  • Subwatershed: Ratz Creek (190101030308)
  • State: Alaska
  • Recovery Domain:
  • Latitude: 55.886391
  • Longitude: -132.6359

ESU

  • Un-Named ESU Sockeye
  • Un-Named ESU Chinook
  • Un-Named ESU Chum
  • Un-Named ESU Coho
  • Un-Named ESU Pink
  • Un-Named ESU Steelhead

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding 6,500.00
    •      . . B.0.b.1 Area Encompassed .0
    •      . . B.0.b.2 Stream Miles Affected 2.00
    •      . . B.2 Salmonid Habitat Assessment / InventoryY (Y/N)
      •      . . . . B.2.a Habitat Assessment Funding 6,500.00
      •      . . . . B.2.c Instream SurveyY (Y/N)
        •      . . . . . . B.2.c.1 Type of instream survey (LOV)
        •      . . . . . . B.2.c.2 Stream miles assessed 2.00
        •      . . . . . . B.2.c.3 Stream miles assessed that contained salmonids .00
        •      . . . . . . B.2.c.4 Stream miles assessed that needed restoration .00
        •      . . . . . . B.2.c.5 Stream miles assessed for regulatory actions 2.00
        •      . . . . . . B.2.c.6 Fish passage impediments identified 0

Davies Creek Gage    


  • Worksite Identifier: Davies Creek Gage
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Northern Southeast Alaska (190103)
  • Subbasin: Lynn Canal (19010301)
  • Watershed: Berners Bay-Frontal Lynn Canal (1901030104)
  • Subwatershed: Davies Creek (190103010401)
  • State: Alaska
  • Recovery Domain:
  • Latitude: 58.655707
  • Longitude: -134.879302

ESU

  • Un-Named ESU Chum
  • Un-Named ESU Coho
  • Un-Named ESU Pink
  • Un-Named ESU Steelhead

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding 15,355.00
    •      . . B.0.b.1 Area Encompassed .0
    •      . . B.0.b.2 Stream Miles Affected 3.00
    •      . . B.2 Salmonid Habitat Assessment / InventoryY (Y/N)
      •      . . . . B.2.a Habitat Assessment Funding 15,355.00
      •      . . . . B.2.c Instream SurveyY (Y/N)
        •      . . . . . . B.2.c.1 Type of instream survey (LOV)
        •      . . . . . . B.2.c.2 Stream miles assessed 3.00
        •      . . . . . . B.2.c.3 Stream miles assessed that contained salmonids .00
        •      . . . . . . B.2.c.4 Stream miles assessed that needed restoration .00
        •      . . . . . . B.2.c.5 Stream miles assessed for regulatory actions 3.00
        •      . . . . . . B.2.c.6 Fish passage impediments identified 0

Cowee Creek Station    


  • Worksite Identifier: Cowee Creek Station
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Northern Southeast Alaska (190103)
  • Subbasin: Lynn Canal (19010301)
  • Watershed: Berners Bay-Frontal Lynn Canal (1901030104)
  • Subwatershed: Cowee Creek (190103010402)
  • State: Alaska
  • Recovery Domain:
  • Latitude: 58.6464
  • Longitude: -134.9089

ESU

  • Un-Named ESU Coho
  • Un-Named ESU Pink
  • Un-Named ESU Steelhead

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding 6,500.00
    •      . . B.0.b.1 Area Encompassed .0
    •      . . B.0.b.2 Stream Miles Affected 2.00
    •      . . B.2 Salmonid Habitat Assessment / InventoryY (Y/N)
      •      . . . . B.2.a Habitat Assessment Funding 6,500.00
      •      . . . . B.2.c Instream SurveyY (Y/N)
        •      . . . . . . B.2.c.1 Type of instream survey (LOV)
        •      . . . . . . B.2.c.2 Stream miles assessed 2.00
        •      . . . . . . B.2.c.3 Stream miles assessed that contained salmonids .00
        •      . . . . . . B.2.c.4 Stream miles assessed that needed restoration .00
        •      . . . . . . B.2.c.5 Stream miles assessed for regulatory actions 2.00
        •      . . . . . . B.2.c.6 Fish passage impediments identified 0

Eagle River Station    


  • Worksite Identifier: Eagle River Station
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Northern Southeast Alaska (190103)
  • Subbasin: Lynn Canal (19010301)
  • Watershed: Herbert River-Eagle River (1901030105)
  • Subwatershed: Eagle River (190103010503)
  • State: Alaska
  • Recovery Domain:
  • Latitude: 58.528252
  • Longitude: -134.805518

ESU

  • Un-Named ESU Chum
  • Un-Named ESU Coho
  • Un-Named ESU Pink

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding 4,314.00
    •      . . B.0.b.1 Area Encompassed .0
    •      . . B.0.b.2 Stream Miles Affected 3.00
    •      . . B.2 Salmonid Habitat Assessment / InventoryY (Y/N)
      •      . . . . B.2.a Habitat Assessment Funding 4,314.27
      •      . . . . B.2.c Instream SurveyY (Y/N)
        •      . . . . . . B.2.c.1 Type of instream survey (LOV)
        •      . . . . . . B.2.c.2 Stream miles assessed 3.00
        •      . . . . . . B.2.c.3 Stream miles assessed that contained salmonids .00
        •      . . . . . . B.2.c.4 Stream miles assessed that needed restoration .00
        •      . . . . . . B.2.c.5 Stream miles assessed for regulatory actions 3.00
        •      . . . . . . B.2.c.6 Fish passage impediments identified 0

Dangerous River    


  • Worksite Identifier: Dangerous River
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Gulf of Alaska (190104)
  • Subbasin: Yakutat Bay-Gulf of Alaska (19010405)
  • Watershed: Yakutat Glacier-Dangerous River (1901040519)
  • Subwatershed: Dangerous River (190104051905)
  • State: Alaska
  • Recovery Domain:
  • Latitude: 59.417067
  • Longitude: -139.024333

ESU

  • Un-Named ESU Sockeye
  • Un-Named ESU Coho

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding 74,000.00
    •      . . B.0.b.1 Area Encompassed .0
    •      . . B.0.b.2 Stream Miles Affected 5.00
    •      . . B.2 Salmonid Habitat Assessment / InventoryY (Y/N)
      •      . . . . B.2.a Habitat Assessment Funding 74,000.00
      •      . . . . B.2.c Instream SurveyY (Y/N)
        •      . . . . . . B.2.c.1 Type of instream survey (LOV)
        •      . . . . . . B.2.c.2 Stream miles assessed 5.00
        •      . . . . . . B.2.c.3 Stream miles assessed that contained salmonids .00
        •      . . . . . . B.2.c.4 Stream miles assessed that needed restoration .00
        •      . . . . . . B.2.c.5 Stream miles assessed for regulatory actions 5.00
        •      . . . . . . B.2.c.6 Fish passage impediments identified 0

Italio River    


  • Worksite Identifier: Italio River
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Gulf of Alaska (190104)
  • Subbasin: Yakutat Bay-Gulf of Alaska (19010405)
  • Watershed: Akwe River-Italio River (1901040520)
  • Subwatershed: Italio River (190104052002)
  • State: Alaska
  • Recovery Domain:
  • Latitude: 59.302262
  • Longitude: -139.055758

ESU

  • Un-Named ESU Sockeye
  • Un-Named ESU Chinook
  • Un-Named ESU Chum
  • Un-Named ESU Coho
  • Un-Named ESU Pink
  • Un-Named ESU Steelhead

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding 70,000.00
    •      . . B.0.b.1 Area Encompassed .0
    •      . . B.0.b.2 Stream Miles Affected 3.00
    •      . . B.2 Salmonid Habitat Assessment / InventoryY (Y/N)
      •      . . . . B.2.a Habitat Assessment Funding 70,000.00
      •      . . . . B.2.c Instream SurveyY (Y/N)
        •      . . . . . . B.2.c.1 Type of instream survey (LOV)
        •      . . . . . . B.2.c.2 Stream miles assessed 3.00
        •      . . . . . . B.2.c.3 Stream miles assessed that contained salmonids .00
        •      . . . . . . B.2.c.4 Stream miles assessed that needed restoration .00
        •      . . . . . . B.2.c.5 Stream miles assessed for regulatory actions 3.00
        •      . . . . . . B.2.c.6 Fish passage impediments identified 0