Hayden Creek Stream Enhancement

Salmonid Habitat Restoration and Acquisition

Fish Passage Improvement Instream Habitat
Project IDOWEB 03-08-001-6862
Recovery DomainsOregon Coast
Start Date07/24/2008
End Date11/14/2008
Year2007
StatusCompleted
Last Edited07/21/2022
 
1 - 1

Description    


This project placed large wood instream; removed culverts or structures and did not replace them; replaced culverts or structures with culverts placed embedded or flat; replaced culverts or structures with open bottom arch culverts.

Project Benefit    


OWRI: improve/increase fish passage; improve/increase stream flow; improve/increase stream gravel recruitment; improve/increase stream over-winter habitat; improve/increase stream rearing habitat; improve/increase stream spawning habitat; improve/increase stream structure & complexity; improve/increase stream summer habitat;

Accomplishments

Metric Completed Originally
Proposed
Instream Habitat
  Stream Miles Treated 1.00
Fish Passage
  Barriers Removed
  Miles Opened 1.00

Funding Details

SourceFunds
State$8,877
Other$2,700
In-Kind Other$9,548
Report Total:$21,125


Project Map



Worksites

20080184    


  • Worksite Identifier: 20080184
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Northern Oregon Coastal
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Oregon
  • Recovery Domain: Oregon Coast
  • Latitude: 44.40530362
  • Longitude: -123.58202339

ESU

  • Lower Columbia River Coho Salmon ESU
  • Oregon Coast Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 21,125.28
    •      . . C.0.b Length of stream treated/protected 1.00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Mid Coast Watersheds Council 6th Field SWatershed Assessment (July 2001)
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.a Fish Passage Funding 16,463.49
      •      . . . . C.2.b.1 Length of stream made accessible 1.00
      •      . . . . C.2.b.3 Type of blockage/barrier (LOV)
      •      . . . . C.2.b.4 Number of blockages/impediments/barriers impeding passage 5
      •      . . . . C.2.f.1 Culvert installed or improved at road stream crossingY (Y/N)
        •      . . . . . . C.2.f.2 Number of culverts installed or improved 2
        •      . . . . . . C.2.f.3 Miles of stream made accessible by culvert installation/upgrade 1.00
      •      . . . . C.2.i.1 Road stream crossing removal Y (Y/N)
        •      . . . . . . C.2.i.2 Number of road crossings removed 3
        •      . . . . . . C.2.i.3 Miles of stream made accessible by road stream crossing removal 1.00
      •      . . C.4 Instream Habitat ProjectY (Y/N)
        •      . . . . C.4.a Instream Habitat Funding 4,661.79
        •      . . . . C.4.b Total length of instream habitat treated 1.00
        •      . . . . C.4.d.1 Channel structure placementY (Y/N)
          •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
          •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement 1.00
          •      . . . . . . C.4.d.7 Number of structures placed in channel 6