PUR Restoration April 2007

Salmonid Habitat Restoration and Acquisition

Fish Passage Improvement Instream Habitat
Project IDOWEB 208-2032-5939
Recovery DomainsOregon Coast
Start Date12/18/2007
End Date05/14/2010
Year2007
StatusCompleted
Last Edited07/21/2022
 
1 - 1

Description    


This project placed boulders instream; placed large wood instream; replaced culverts or structures with a bridge; replaced culverts or structures with culverts placed embedded or flat.

Project Benefit    


OWRI: improve/increase stream gravel recruitment; improve/increase stream interaction with floodplain; improve/increase stream over-winter habitat; improve/increase stream pools; improve/increase stream rearing habitat; improve/increase stream spawning habitat; improve/increase stream structure & complexity; improve/increase stream summer habitat;

Accomplishments

Metric Completed Originally
Proposed
Instream Habitat
  Stream Miles Treated 4.50
Fish Passage
  Barriers Removed
  Miles Opened 5.00

Funding Details

SourceFunds
State$311,782
Other$29,151
In-Kind Donated Labor$22,600
In-Kind Other$85,525
Report Total:$449,058


Project Map



Worksites

20090424    


  • Worksite Identifier: 20090424
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Southern Oregon Coastal
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Oregon
  • Recovery Domain: Oregon Coast
  • Latitude: 43.58044786
  • Longitude: -123.4865124

ESU

  • Lower Columbia River Coho Salmon ESU
  • Oregon Coast Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 303,501.20
    •      . . C.0.b Length of stream treated/protected 2.00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Upper Umpqua River Watershed Assessment; Middle South Umpqua/Rice Creek Watershed Assessment; Upper South Umpqua Watershed Analysis
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.a Fish Passage Funding 201,710.58
      •      . . . . C.2.b.1 Length of stream made accessible 5.00
      •      . . . . C.2.b.3 Type of blockage/barrier (LOV)
      •      . . . . C.2.b.4 Number of blockages/impediments/barriers impeding passage 3
      •      . . . . C.2.f.1 Culvert installed or improved at road stream crossingY (Y/N)
        •      . . . . . . C.2.f.2 Number of culverts installed or improved 2
        •      . . . . . . C.2.f.3 Miles of stream made accessible by culvert installation/upgrade 5.00
      •      . . . . C.2.g.1 Bridge installed or improved at road stream crossingY (Y/N)
        •      . . . . . . C.2.g.2 Number of bridges installed or improved/upgraded 1
        •      . . . . . . C.2.g.3 Miles of stream made accessible by bridge installation or improvement/upgrade 5.00
      •      . . C.4 Instream Habitat ProjectY (Y/N)
        •      . . . . C.4.a Instream Habitat Funding 101,790.62
        •      . . . . C.4.b Total length of instream habitat treated 2.00
        •      . . . . C.4.d.1 Channel structure placementY (Y/N)
          •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
          •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement 2.00
          •      . . . . . . C.4.d.7 Number of structures placed in channel 668

20090512    


  • Worksite Identifier: 20090512
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Southern Oregon Coastal
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Oregon
  • Recovery Domain: Oregon Coast
  • Latitude: 43.04570426
  • Longitude: -122.73478711

ESU

  • Oregon Coast Chinook Salmon ESU
  • Lower Columbia River Coho Salmon ESU
  • Oregon Coast Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 145,556.58
    •      . . C.0.b Length of stream treated/protected 2.50
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Tiller Region Assessment and Action Plan/2003/Umpqua Basin Watershed Council
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 145,556.58
      •      . . . . C.4.b Total length of instream habitat treated 2.50
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement 2.50
        •      . . . . . . C.4.d.7 Number of structures placed in channel 103