Skokomish Enetai Creek Hatchery - Modernize, Retrofit, and Upgrade Incubation Facility
Salmonid Hatcheries and Harvest Management
|
19HR E-5 | Puget Sound | 06/01/2020 | 08/31/2022 | 2019 | Completed | 02/27/2024 | |
| |
Description
This project intended to modernize, retrofit, and upgrade the incubation facility to provide sufficient infrastructure, and incubation space, and increase the number of incubators. Due to structural issues and concerns with the existing incubation facility, this project utilized Best Hatchery Management Practices Criteria and Technological Advances by implementing Redd Zone’s modular hatchery design concept.
Project Benefit
The project improved overall efficiency and ergonomics and maximized benefits from hatchery production (brood stock to adult return). This project addressed several causative problems and factors, including: inadequate incubation conditions, low green egg to eyed survival rates due to high loading densities, and repeated incidence of environmental gill disease, which in some cases has led to bacterial gill disease requiring treatment which indicates that something is fundamentally wrong with the hatchery operation or physical set-up of the hatchery.
Funding Details |
PCSRF | $100,000 |
Report Total: | $100,000 |
|
| |
Worksites
46813976
- Worksite Identifier: 46813976
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Puget Sound (171100)
- Subbasin: Hood Canal (17110018)
- Watershed: Lilliwaup Creek-Frontal Hood Canal (1711001803)
- Subwatershed: Finch Creek-Frontal Hood Canal (171100180301)
- State: Washington
- Recovery Domain: Puget Sound
- Latitude: 47.356461
- Longitude: -123.160071
ESU
- Puget Sound/Strait of Georgia Chum Salmon ESU
Map
Photos
Metrics
Metrics
- D.0
Salmonid Hatcheries and Harvest ManagementY (Y/N)
- . . D.0.a
Hatchery and harvest mgmt. funding 100,000.00
- . . D.0.b
Complement habitat restoration project | |
|
- . . D.0.c
Project Identified in a plan or watershed assessment. | |
|
- . . D.1
Hatchery Production ProjectY (Y/N)
- . . . . D.1.a
Hatchery Production Funding 100,000.00
- . . . . D.1.c.1
Hatchery operations - facility or equipmentY (Y/N)
- . . . . . . D.1.c.2
Description of the facility modification and/or equipment purchase | |
The supports an incubation facility upgrade utilizing technological advances by implementing Redd Zone’s modular hatchery design concept. |
- . . . . . . D.1.c.3
Funding for facility equipment or structures 100,000.00
|
|