Elk Creek Phase VI
Salmonid Habitat Restoration and Acquisition
|
Elk Creek Phase VI | Oregon Coast | 07/01/2017 | 06/08/2020 | 2017 | Cancelled | 01/25/2024 | |
| |
Description
Funds awarded for the Elk Creek Cooperative Salmon Habitat Recovery Project were intended to go towards the design and replacement a bridge spanning Elk Creek near Tiller, OR (PCSRF 2013, 2014, and 2017). Once the designs were complete they were sent out to contractors to bid on the project. We received no bids during the open competition period, but did have interest from one firm. That firm did submit a bid for consideration after the open competition period and it came in at roughly $1 million over budget. We had discussions with the contractor that bid on the project and we were able to cut some expenses with the help of the land owners but the proposal was still $500,000 over budget. After exploring other funding options and finding none, we determined that this project cannot move forward at this time with the funding we have.
Project Benefit
The benefits of this project will include the removal of a copper and lead painted degrading bridge. The copper can impact salmonid growth potential by reducing survival and lifetime reproductive success and cause behavioral and sensory disruptions. There will be an increase in side channel and floodplain connectivity which is a known limiting factor for juvenile Coho salmon and a increase in the floodplain area by 0.04 acres. The removal of invasive species in the riparian area and planting of hardwood and conifers should provide for long-term wood recruitment into the stream channel and provide stream shading.
Funding DetailsNo Funding data has been entered for this project.
Worksites
Confluence of Elk and drew Creeks
- Worksite Identifier: Confluence of Elk and drew Creeks
- Start Date: 07/01/2017
- End Date: 12/31/2020
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Southern Oregon Coastal (171003)
- Subbasin: South Umpqua (17100302)
- Watershed: Elk Creek (1710030204)
- Subwatershed: Lower Elk Creek (171003020404)
- State: Oregon
- Recovery Domain: Oregon Coast
- Latitude: 42.890654892
- Longitude: -122.922599316
ESU
- Oregon Coast Coho Salmon ESU
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding .00
- . . C.0.b
Length of stream treated/protected .00
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
|
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding .00
- . . . . C.4.b
Total length of instream habitat treated .00
- . . . . C.4.c.1
Channel reconfiguration and connectivityY (Y/N)
- . . . . . . C.4.c.2
Type of change to channel configuration and connectivity (LOV)
- . . . . . . C.4.c.3
Miles of stream treated for channel reconfiguration and connectivity .00
- . . . . . . C.4.c.4
Miles of off-channel stream created through channel reconfiguration and connectivity .00
- . . . . . . C.4.c.6
Instream pools created/added through channel reconfiguration and connectivity 0
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding .00
- . . . . C.5.b.1
Total riparian miles streambank treated .00
- . . . . C.5.b.2
Total Riparian Acres Treated .0
- . . . . C.5.c.1
Riparian plantingY (Y/N)
- . . . . . . C.5.c.2
Species of plants planted in riparian | |
N/A |
- . . . . . . C.5.c.3
Acres planted in riparian .0
- . . . . . . C.5.c.4
Miles of streambank treated with riparian planting .00
- . . . . C.5.h.1
Riparian plant removal/controlY (Y/N)
- . . . . . . C.5.h.2
Species of plants treated/removed in riparian | |
N/A |
- . . . . . . C.5.h.3
Acres of riparian treated for plant removal/control .0
- . . . . . . C.5.h.4
Miles of streambank treated for riparian plant removal/control .00
|
|