Staney Creek Restoration
Salmonid Habitat Restoration and Acquisition
|
AK44918 | - | 03/01/2017 | 02/28/2018 | 2013 | Completed | 01/25/2024 | |
| |
Description
This project improved salmonid habitat on approximately 0.3 miles of Scout Creek through the placement of 12 instream structures using heavy equipment. Iimmediate results included the creation of three new pools and the enhancement of two others as well as armoring the stream banks at strategic locations, increasing floodplain roughness through the placement of rootwad trees, and reconnection of side channels by raising the stream bed with strategically placed structures.
Project Benefit
This project will maintain and enhance fish habitat by improving habitat conditions for juvenile salmonids through accelerating the recovery of fluvial processes currently leading to bank erosion and channel widening; improving pool frequency and complexity through placement of rootwad trees; improving year-round holding and rearing habitat through pool creation and floodplain connectivity; and improving floodplain conditions by providing nurse logs and roughness elements for flood resilience. Improved habitat will sustain anadromous and resident salmonid populations for future commercial, sport, and subsistence fishing, providing a long-term socioeconomic benefit to southeast Alaska.
Accomplishments
Instream Habitat |
Stream Miles Treated |
.30 |
.30 |
Funding Details |
PCSRF | $69,947 |
Other | $49,924 |
Report Total: | $119,871 |
|
| |
Worksites
41705676
- Worksite Identifier: 41705676
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Southern Southeast Alaska (190101)
- Subbasin:
- Watershed:
- Subwatershed:
- State: Alaska
- Recovery Domain:
- Latitude: 55.740293
- Longitude: -133.01947
ESU
- Un-Named ESU Coho
- Un-Named ESU Steelhead
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 119,871.00
- . . C.0.b
Length of stream treated/protected .30
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
|
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 119,871.00
- . . . . C.4.b
Total length of instream habitat treated .30
- . . . . C.4.d.1
Channel structure placementY (Y/N)
- . . . . . . C.4.d.2
Material used for channel structure (LOV)
- . . . . . . C.4.d.3
Miles of stream treated through channel structure placement .30
- . . . . . . C.4.d.5
Pools expected to be created through channel structure placement 3
- . . . . . . C.4.d.7
Number of structures placed in channel 12
|
|