Pinole Creek Fish Passage Improvement Project

Salmonid Habitat Restoration and Acquisition

Fish Passage Improvement
Project ID725028
Recovery DomainsN Central California Coast
Start Date06/01/2016
End Date05/25/2018
Year2015
StatusCompleted
Last Edited01/25/2024
 
1 - 1

Description    


1 culvert was improved to allow access to 6.8 miles of upstream habitat.

Project Benefit    


Increase fish passage by altering the current culvert to allow for fish passage during low-flow events.

Accomplishments

Metric Completed Originally
Proposed
Fish Passage
  Barriers Removed
  Miles Opened 6.80 6.80

Funding Details

SourceFunds
State$189,562
Other$620,906
Report Total:$810,468


Project Map



Worksites

7211080    


  • Worksite Identifier: 7211080
  • Start Date:
  • End Date:
Area Description
Site 1

Location Information

  • Basin: San Francisco Bay (180500)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 37.996289
  • Longitude: -122.28792

ESU

  • Central California Coast Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 810,468.00
    •      . . C.0.b Length of stream treated/protected .10
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Upper Pinole Creek Watershed Habitat Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.a Fish Passage Funding 810,468.00
      •      . . . . C.2.b.1 Length of stream made accessible 6.80
      •      . . . . C.2.b.3 Type of blockage/barrier (LOV)
      •      . . . . C.2.b.4 Number of blockages/impediments/barriers impeding passage 1
      •      . . . . C.2.f.1 Culvert installed or improved at road stream crossingY (Y/N)
        •      . . . . . . C.2.f.2 Number of culverts installed or improved 1
        •      . . . . . . C.2.f.3 Miles of stream made accessible by culvert installation/upgrade 6.80