Description    


On 8/10/15 a request was made to NOAA to revise this project from its original scope. The original scope was to implement instream restoration in two miles of Elk Creek. The scope of the project was revised due to the increased cost of a bridge removal and replacement project on Elk Creek. The decision was made to prioritize the bridge project and therefore re-allocate funds. The revised scope of the Elk Creek Cooperative Salmon Habitat Project Phase III-Implementation focused on removal of invasive species (Rubus armeniacus) and planting of native species (Philidelphis lewisii, Cornus sericea, Symphoricarpos albus, Physocarpus capitatus, Acer circinatum, fescue) on 0.02 acres of riparian habitat along Elk Creek.

Project Benefit    


This project befits coho salmon, through removal of invasive species and planting of native stream side vegetation to restore riparian function to the stream ecosystem.

Accomplishments

Metric Completed Originally
Proposed
Riparian Habitat
  Stream Miles Treated .02 .02
  Acres Treated .1 .1

Funding Details

SourceFunds
PCSRF$10,244
Report Total:$10,244


Project Map



Worksites

Elk Creek    


  • Worksite Identifier: Elk Creek
  • Start Date: 07/01/2012
  • End Date: 12/31/2016
Area Description
Elk Creek, private property

Location Information

  • Basin: Southern Oregon Coastal (171003)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Oregon
  • Recovery Domain: Oregon Coast
  • Latitude: 42.88584995960678
  • Longitude: -122.90713638066961

ESU

  • Oregon Coast Coho Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 10,244.00
    •      . . C.0.b Length of stream treated/protected .02
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Elk Creek Level II Stream Survey, 2007. Umpqua National Forest, Tiller Ranger District.
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.5 Riparian Habitat ProjectY (Y/N)
      •      . . . . C.5.a Riparian Habitat Funding 10,244.00
      •      . . . . C.5.b.1 Total riparian miles streambank treated .02
      •      . . . . C.5.b.2 Total Riparian Acres Treated .1
      •      . . . . C.5.c.1 Riparian plantingY (Y/N)
        •      . . . . . . C.5.c.2
          Species of plants planted in riparian
          Philidelphis lewisii, Cornus sericea, Symphoricarpos albus, Physocarpus capitatus, Acer circinatum, fescue
        •      . . . . . . C.5.c.3 Acres planted in riparian .1
        •      . . . . . . C.5.c.4 Miles of streambank treated with riparian planting .02
      •      . . . . C.5.h.1 Riparian plant removal/controlY (Y/N)
        •      . . . . . . C.5.h.2
          Species of plants treated/removed in riparian
          Rubus armeniacus
        •      . . . . . . C.5.h.3 Acres of riparian treated for plant removal/control .1
        •      . . . . . . C.5.h.4 Miles of streambank treated for riparian plant removal/control .02