Seiad Creek Coho Habitat Enhancement Project

Salmonid Habitat Restoration and Acquisition

Instream Habitat
Project ID724572
Recovery DomainsN CA - S Oregon
Start Date06/01/2015
End Date02/06/2018
Year2013
StatusCompleted
Last Edited01/25/2024
 
1 - 1

Description    


Restore .5 mile of creek channel by returning the natural stream meandering, creating off channel floodplain habitat, installation of instream wood structures, and riparian planting.

Project Benefit    


Spawning requirements will be met, rearing habitat will be increased, and riparian dysfunction will be increased.

Accomplishments

Metric Completed Originally
Proposed
Instream Habitat
  Stream Miles Treated .50 .75

Funding Details

SourceFunds
PCSRF$446,284
Other$170,150
Report Total:$616,434


Project Map



Worksites

7210890    


  • Worksite Identifier: 7210890
  • Start Date:
  • End Date:
Area Description
Seiad Creek

Location Information

  • Basin: Klamath (180102)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: California
  • Recovery Domain: N CA - S Oregon
  • Latitude: 41.842501
  • Longitude: -123.19716

ESU

  • Southern Oregon/Northern California Coast Coho Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 1,573,168.00
    •      . . C.0.b Length of stream treated/protected .50
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      National Marine Fisheries Service, 2012, Recovery Plan for So. OR/No. CA Coast Coho Salmon, National Marine Fisheries Service, Arcata, CA
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 447,282.00
      •      . . . . C.4.b Total length of instream habitat treated .50
      •      . . . . C.4.c.1 Channel reconfiguration and connectivityY (Y/N)
        •      . . . . . . C.4.c.2 Type of change to channel configuration and connectivity (LOV)
        •      . . . . . . C.4.c.3 Miles of stream treated for channel reconfiguration and connectivity .50
        •      . . . . . . C.4.c.4 Miles of off-channel stream created through channel reconfiguration and connectivity .30
        •      . . . . . . C.4.c.6 Instream pools created/added through channel reconfiguration and connectivity 7
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .50
        •      . . . . . . C.4.d.5 Pools expected to be created through channel structure placement 7
        •      . . . . . . C.4.d.7 Number of structures placed in channel 50
      •      . . . . C.4.e.1 Streambank stabilization Y (Y/N)
        •      . . . . . . C.4.e.2 Material Used For Streambank Stabilization (LOV)
        •      . . . . . . C.4.e.3 Miles of streambank stabilized 1.00