Grape Creek Instream Habitat Improvement Project

Salmonid Habitat Restoration and Acquisition

Instream Habitat
Project ID724520
Recovery DomainsN Central California Coast
Start Date06/01/2015
End Date03/31/2016
Year2014
StatusCompleted
Last Edited01/25/2024
 
1 - 1

Description    


The grantee installed eight large wood structures at nine locations within the worksite using 35 pieces lof large wood including 17 logs and 18 logs with root wads attached. Additionally about 700 square feet of off channel habitat was constructed at one site.

Project Benefit    


Increase habitat structure and complexity in Dry Creek (and its tributaries) to enhance habitat diversity, including depositional areas for spawning gravels for coho salmon.

Accomplishments

Metric Completed Originally
Proposed
Instream Habitat
  Stream Miles Treated .03 .09

Funding Details

SourceFunds
PCSRF$158,482
Other$11,729
Report Total:$170,211


Project Map



Worksites

7210942    


  • Worksite Identifier: 7210942
  • Start Date:
  • End Date:
Area Description
Site 1

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 38.656
  • Longitude: -122.947

ESU

  • Central California Coast Coho Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 170,211.00
    •      . . C.0.b Length of stream treated/protected .03
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Robert Coey, Sarah Nossaman-Pearce, Colin Brooks and Zeb Young, 2002, CA Department of Fish and Wildlife Draft Russian River Basin Fisheries Restoration Plan, accessed through the Russian River Interactive Information System, www.russianriverwatershed.net, CA Department of Fish and Wildlife, Santa Rosa, CA
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 170,211.00
      •      . . . . C.4.b Total length of instream habitat treated .03
      •      . . . . C.4.c.1 Channel reconfiguration and connectivityY (Y/N)
        •      . . . . . . C.4.c.2 Type of change to channel configuration and connectivity (LOV)
        •      . . . . . . C.4.c.3 Miles of stream treated for channel reconfiguration and connectivity .01
        •      . . . . . . C.4.c.4 Miles of off-channel stream created through channel reconfiguration and connectivity .01
        •      . . . . . . C.4.c.6 Instream pools created/added through channel reconfiguration and connectivity 8
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .02
        •      . . . . . . C.4.d.5 Pools expected to be created through channel structure placement 0
        •      . . . . . . C.4.d.7 Number of structures placed in channel 9