Grape Creek Instream Habitat Improvement Project
Salmonid Habitat Restoration and Acquisition
|
724520 | N Central California Coast | 06/01/2015 | 03/31/2016 | 2014 | Completed | 01/25/2024 | |
| |
Description
The grantee installed eight large wood structures at nine locations within the worksite using 35 pieces lof large wood including 17 logs and 18 logs with root wads attached. Additionally about 700 square feet of off channel habitat was constructed at one site.
Project Benefit
Increase habitat structure and complexity in Dry Creek (and its tributaries) to enhance habitat diversity, including depositional areas for spawning gravels for coho salmon.
Accomplishments
Instream Habitat |
Stream Miles Treated |
.03 |
.09 |
Funding Details |
PCSRF | $158,482 |
Other | $11,729 |
Report Total: | $170,211 |
|
| |
Worksites
7210942
- Worksite Identifier: 7210942
- Start Date:
- End Date:
Area Description
Site 1
Location Information
- Basin: Northern California Coastal (180101)
- Subbasin:
- Watershed:
- Subwatershed:
- State: California
- Recovery Domain: N Central California Coast
- Latitude: 38.656
- Longitude: -122.947
ESU
- Central California Coast Coho Salmon ESU
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 170,211.00
- . . C.0.b
Length of stream treated/protected .03
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Robert Coey, Sarah Nossaman-Pearce, Colin Brooks and Zeb Young, 2002, CA Department of Fish and Wildlife Draft Russian River Basin Fisheries Restoration Plan, accessed through the Russian River Interactive Information System, www.russianriverwatershed.net, CA Department of Fish and Wildlife, Santa Rosa, CA |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 170,211.00
- . . . . C.4.b
Total length of instream habitat treated .03
- . . . . C.4.c.1
Channel reconfiguration and connectivityY (Y/N)
- . . . . . . C.4.c.2
Type of change to channel configuration and connectivity (LOV)
- . . . . . . C.4.c.3
Miles of stream treated for channel reconfiguration and connectivity .01
- . . . . . . C.4.c.4
Miles of off-channel stream created through channel reconfiguration and connectivity .01
- . . . . . . C.4.c.6
Instream pools created/added through channel reconfiguration and connectivity 8
- . . . . C.4.d.1
Channel structure placementY (Y/N)
- . . . . . . C.4.d.2
Material used for channel structure (LOV)
- . . . . . . C.4.d.3
Miles of stream treated through channel structure placement .02
- . . . . . . C.4.d.5
Pools expected to be created through channel structure placement 0
- . . . . . . C.4.d.7
Number of structures placed in channel 9
|
|