Kuiu Island Stream Restoration
Salmonid Habitat Restoration and Acquisition
|
AK44718 | - | 04/01/2013 | 06/30/2015 | 2011 | Completed | 05/08/2024 | |
| |
Description
Stream and floodplain restoration work was completed on approximately 4.0 km of high value salmon and steelhead streams on Kuiu Island in Southeast Alaska. Approximately 1,100 pieces of wood were used along four different sections of streams to stabilize banks in some places and to improve instream habitat in others. The work was completed using two separate contracts; one for heavy equipment and another for a medium-lift Vertol helicopter. All four excavators and the helicopter were used to transport and deck wood near the stream and to construct structures within the channels and floodplain. In-stream work began June 20th and ended ahead of schedule on July 20, 2014, prior to adult salmon arrival to spawn. At one of the four sites (on the mainstem of Sagniaw Creek downstream of the bridge), invasive reed canary grass was also removed. Work at a fifth location on the mainstem of Saginaw Creek (upstream of the bridge) was not completed as expected because there were no heavy lift helicopters available to access the site.
Project Benefit
This project will enhance salmon and steelhead habitat by improving overwintering conditions for juvenile coho salmon and steelhead trout; accelerating recovery of fluvial processes currently leading to bank erosion and channel widening; improving instream pool complexity and cover through placement of root wad trees; improving year-round low velocity adult salmonid holding and juvenile rearing habitat through pool creation; and improving floodplain conditions adjacent to salmon streams by providing nurse logs and roughness elements for flood resilience.
Accomplishments
Instream Habitat |
Stream Miles Treated |
2.50 |
2.40 |
Funding Details |
PCSRF | $143,934 |
Other | $779,320 |
Report Total: | $923,254 |
|
| |
Worksites
West Fork Saginaw Creek
- Worksite Identifier: West Fork Saginaw Creek
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Central Southeast Alaska (190102)
- Subbasin:
- Watershed:
- Subwatershed:
- State: Alaska
- Recovery Domain:
- Latitude: 56.821176
- Longitude: -134.211782
ESU
- Un-Named ESU Coho
- Un-Named ESU Pink
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 568,073.00
- . . C.0.b
Length of stream treated/protected 1.50
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Saginaw Creek Watershed Restoration Plan - Petersburg Ranger District. USDA Forest Service, Tongass National Forest, Petersburg, AK. Internal Communication. |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 568,073.00
- . . . . C.4.b
Total length of instream habitat treated 1.50
- . . . . C.4.d.1
Channel structure placementY (Y/N)
- . . . . . . C.4.d.2
Material used for channel structure (LOV)
- . . . . . . C.4.d.3
Miles of stream treated through channel structure placement .30
- . . . . . . C.4.d.5
Pools expected to be created through channel structure placement 5
- . . . . . . C.4.d.7
Number of structures placed in channel 5
- . . . . C.4.e.1
Streambank stabilization Y (Y/N)
- . . . . . . C.4.e.2
Material Used For Streambank Stabilization (LOV)
- . . . . . . C.4.e.3
Miles of streambank stabilized 1.20
Mainstem Saginaw Creek (#1, upstream from bridge)
- Worksite Identifier: Mainstem Saginaw Creek (#1, upstream from bridge)
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Central Southeast Alaska (190102)
- Subbasin:
- Watershed:
- Subwatershed:
- State: Alaska
- Recovery Domain:
- Latitude: 56.830179
- Longitude: -134.16486
ESU
- Un-Named ESU Chum
- Un-Named ESU Coho
- Un-Named ESU Pink
- Un-Named ESU Steelhead
- Un-Named ESU Cutthroat
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding .00
- . . C.0.b
Length of stream treated/protected .00
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
US Forest Service. 2007a. Watershed Restoration Plan. Saginaw Creek - Petersburg Ranger District. USDA Forest Service, Tongass National Forest, Petersubrg, AK. Internal Communication. |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding .00
- . . . . C.4.b
Total length of instream habitat treated .00
- . . . . C.4.d.1
Channel structure placementY (Y/N)
- . . . . . . C.4.d.2
Material used for channel structure (LOV)
- . . . . . . C.4.d.3
Miles of stream treated through channel structure placement .00
- . . . . . . C.4.d.5
Pools expected to be created through channel structure placement 0
- . . . . . . C.4.d.7
Number of structures placed in channel 0
- . . . . C.4.e.1
Streambank stabilization Y (Y/N)
- . . . . . . C.4.e.2
Material Used For Streambank Stabilization (LOV)
- . . . . . . C.4.e.3
Miles of streambank stabilized .00
Mainstem Saginaw Creek (#2, downstream from bridge)
- Worksite Identifier: Mainstem Saginaw Creek (#2, downstream from bridge)
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Central Southeast Alaska (190102)
- Subbasin:
- Watershed:
- Subwatershed:
- State: Alaska
- Recovery Domain:
- Latitude: 56.833028
- Longitude: -134.160793
ESU
- Un-Named ESU Chum
- Un-Named ESU Coho
- Un-Named ESU Pink
- Un-Named ESU Steelhead
- Un-Named ESU Cutthroat
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 136,577.00
- . . C.0.b
Length of stream treated/protected .50
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Saginaw Creek Watershed Restoration Plan - Petersburg Ranger District. USDA Forest Service, Tongass National Forest, Petersburg, AK. Internal Communication. |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 136,577.00
- . . . . C.4.b
Total length of instream habitat treated .50
- . . . . C.4.d.1
Channel structure placementY (Y/N)
- . . . . . . C.4.d.2
Material used for channel structure (LOV)
- . . . . . . C.4.d.3
Miles of stream treated through channel structure placement .10
- . . . . . . C.4.d.5
Pools expected to be created through channel structure placement 2
- . . . . . . C.4.d.7
Number of structures placed in channel 2
- . . . . C.4.e.1
Streambank stabilization Y (Y/N)
- . . . . . . C.4.e.2
Material Used For Streambank Stabilization (LOV)
- . . . . . . C.4.e.3
Miles of streambank stabilized .40
- . . . . C.4.g.1
Plant removal/controlY (Y/N)
- . . . . . . C.4.g.2
Species of plants removed/controlled | |
Phalaris arundinacea |
- . . . . . . C.4.g.3
Miles of stream treated for plant removal/control .10
Josie Creek
- Worksite Identifier: Josie Creek
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Central Southeast Alaska (190102)
- Subbasin:
- Watershed:
- Subwatershed:
- State: Alaska
- Recovery Domain:
- Latitude: 56.682438
- Longitude: -134.191837
ESU
- Un-Named ESU Chum
- Un-Named ESU Coho
- Un-Named ESU Pink
- Un-Named ESU Steelhead
- Un-Named ESU Cutthroat
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 103,656.00
- . . C.0.b
Length of stream treated/protected .30
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
North Kuiu Integrated Resource Management Plan; 2009 North Kuiu Stream Restoration Opportunities - Petersburg Ranger District. USDA Forest Service, Tongass National Forest, Petersburg, AK. Internal Communication. |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 103,656.00
- . . . . C.4.b
Total length of instream habitat treated .30
- . . . . C.4.d.1
Channel structure placementY (Y/N)
- . . . . . . C.4.d.2
Material used for channel structure (LOV)
- . . . . . . C.4.d.3
Miles of stream treated through channel structure placement .05
- . . . . . . C.4.d.5
Pools expected to be created through channel structure placement 2
- . . . . . . C.4.d.7
Number of structures placed in channel 2
- . . . . C.4.e.1
Streambank stabilization Y (Y/N)
- . . . . . . C.4.e.2
Material Used For Streambank Stabilization (LOV)
- . . . . . . C.4.e.3
Miles of streambank stabilized .25
South Fork Kadake Creek
- Worksite Identifier: South Fork Kadake Creek
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Central Southeast Alaska (190102)
- Subbasin:
- Watershed:
- Subwatershed:
- State: Alaska
- Recovery Domain:
- Latitude: 56.712069
- Longitude: -134.066019
ESU
- Un-Named ESU Chum
- Un-Named ESU Coho
- Un-Named ESU Pink
- Un-Named ESU Steelhead
- Un-Named ESU Cutthroat
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 114,948.00
- . . C.0.b
Length of stream treated/protected .20
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Kadake Creek Watershed Restoration Plan - Petersburg Ranger District. USDA Forest Service, Tongass National Forest, Petersburg, AK. Internal Communication. |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 114,948.00
- . . . . C.4.b
Total length of instream habitat treated .20
- . . . . C.4.d.1
Channel structure placementY (Y/N)
- . . . . . . C.4.d.2
Material used for channel structure (LOV)
- . . . . . . C.4.d.3
Miles of stream treated through channel structure placement .05
- . . . . . . C.4.d.5
Pools expected to be created through channel structure placement 1
- . . . . . . C.4.d.7
Number of structures placed in channel 1
- . . . . C.4.e.1
Streambank stabilization Y (Y/N)
- . . . . . . C.4.e.2
Material Used For Streambank Stabilization (LOV)
- . . . . . . C.4.e.3
Miles of streambank stabilized .15
|
|