Strawberry Creek Restoration - RNSP Reach
Salmonid Habitat Restoration and Acquisition
|
723848 | N Central California Coast | 06/01/2012 | 04/04/2016 | 2011 | Completed | 05/08/2024 | |
| |
Description
7210166/7210225 - A new channel was excavated in Strawberry Creek. Twelve wood profile control structures and 7 large pieces of wood were installed for habitat and cover. •Michael Love and Associates (MLA) prepared an as-built survey of the constructed project that includes: a channel longitudinal thalweg profile with culvert invert elevations; up to ten channel and over-bank cross sections; locations and elevations of the log profile control structures; and locations of log cover structures. The west tributary culvert and upstream channel excavation tasks were deleted from the project and the grant was reduced by $52,175.00. This change in the scope of work was required due to permit delays.
7210167 - The surrounding wetland was restored by removing invasive grasses. Earthen planting mounds were constructed adjacent to the stream channels. • 3,100 feet of elk exclusion fencing was installed. •A 25-foot riparian vegetation corridor (two acres) was planted along each side of the re-profiled channel. 8,000 2-year old Sitka spruce, 3,500 red alder, and 5,000 willow sprigs were planted. •The banks were mulched using cardboard and burlap overlain with shredded redwood bark as a weed barrier.
7210224 - 0.1 miles of road were closed affecting 0.1 acres of upland habitat.
Worksite 7210225: 1 culvert will be replaced with a stream-simulation bed.
Worksite 7210226 and 7210227: 2 road crossing barriers impeding coho passage.
Project Benefit
The objective is to improve fish passage and rearing habitat by restoring 1,600 feet of channel.
Accomplishments
Instream Habitat |
Stream Miles Treated |
1.30 |
.10 |
Riparian Habitat |
Stream Miles Treated |
.30 |
.41 |
Acres Treated |
1.8 |
2.0 |
Upland Habitat |
Acres Treated |
.1 |
.1 |
Fish Passage |
Barriers Removed |
|
|
Miles Opened |
.80 |
.80 |
Funding Details |
PCSRF | $448,899 |
Other | $242,489 |
Report Total: | $691,388 |
|
| |
Worksites
7210167
- Worksite Identifier: 7210167
- Start Date:
- End Date:
Area Description
Strawberry Creek - riparian treatments
Location Information
- Basin: Northern California Coastal (180101)
- Subbasin:
- Watershed:
- Subwatershed:
- State: California
- Recovery Domain: N Central California Coast
- Latitude: 41.2750958771135
- Longitude: -124.075358322751
ESU
- Southern Oregon/Northern California Coast Coho Salmon ESU
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 172,847.00
- . . C.0.b
Length of stream treated/protected .30
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Cline R., Redwood National Park. Strawberry Creek Watershed Assessment. 1992. |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 86,423.50
- . . . . C.4.b
Total length of instream habitat treated .30
- . . . . C.4.g.1
Plant removal/controlY (Y/N)
- . . . . . . C.4.g.2
Species of plants removed/controlled | |
Reed Canary Grass |
- . . . . . . C.4.g.3
Miles of stream treated for plant removal/control .30
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding 86,423.50
- . . . . C.5.b.1
Total riparian miles streambank treated .30
- . . . . C.5.b.2
Total Riparian Acres Treated 1.8
- . . . . C.5.c.1
Riparian plantingY (Y/N)
- . . . . . . C.5.c.2
Species of plants planted in riparian | |
Picea sitchensis, Alnus rubra, Salix |
- . . . . . . C.5.c.3
Acres planted in riparian 1.8
- . . . . C.5.d.1
FencingY (Y/N)
- . . . . . . C.5.d.2
Miles of fence along stream .60
- . . . . C.5.h.1
Riparian plant removal/controlY (Y/N)
- . . . . . . C.5.h.2
Species of plants treated/removed in riparian | |
Reed Canary Grass |
- . . . . . . C.5.h.3
Acres of riparian treated for plant removal/control 1.8
7210224
- Worksite Identifier: 7210224
- Start Date:
- End Date:
Area Description
Strawberry Creek - upslope crossing 14
Location Information
- Basin: Northern California Coastal (180101)
- Subbasin:
- Watershed:
- Subwatershed:
- State: California
- Recovery Domain: N Central California Coast
- Latitude: 41.2723220543996
- Longitude: -124.07149594177
ESU
- Southern Oregon/Northern California Coast Coho Salmon ESU
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 86,424.00
- . . C.0.b
Length of stream treated/protected .00
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Cline R., Redwood National Park. Strawberry Creek Watershed Assessment. 1992. |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.6
Upland Habitat And Sediment ProjectY (Y/N)
- . . . . C.6.a
Upland Habitat / Sediment Funding 86,423.50
- . . . . C.6.b.1
Acres of upland habitat area treated .1
- . . . . C.6.b.2
Miles of road treated in upland area .10
- . . . . C.6.d.1
Road closure / abandonmentY (Y/N)
- . . . . . . C.6.d.2
Miles of road closed / abandoned .10
7210225
- Worksite Identifier: 7210225
- Start Date:
- End Date:
Area Description
Strawberry Creek - upslope crossing 25
Location Information
- Basin: Northern California Coastal (180101)
- Subbasin:
- Watershed:
- Subwatershed:
- State: California
- Recovery Domain: N Central California Coast
- Latitude: 41.2681288428321
- Longitude: -124.074671677244
ESU
- Southern Oregon/Northern California Coast Coho Salmon ESU
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 86,424.00
- . . C.0.b
Length of stream treated/protected .10
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Cline R., Redwood National Park. Strawberry Creek Watershed Assessment. 1992. |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.2
Fish Passage ImprovementY (Y/N)
- . . . . C.2.a
Fish Passage Funding 86,423.50
- . . . . C.2.b.1
Length of stream made accessible .10
- . . . . C.2.b.3
Type of blockage/barrier (LOV)
- . . . . C.2.b.4
Number of blockages/impediments/barriers impeding passage 1
- . . . . C.2.f.1
Culvert installed or improved at road stream crossingY (Y/N)
- . . . . . . C.2.f.2
Number of culverts installed or improved 1
- . . . . . . C.2.f.3
Miles of stream made accessible by culvert installation/upgrade .10
7210226
- Worksite Identifier: 7210226
- Start Date:
- End Date:
Area Description
Strawberry Creek - upslope crossing 24
Location Information
- Basin: Northern California Coastal (180101)
- Subbasin:
- Watershed:
- Subwatershed:
- State: California
- Recovery Domain: N Central California Coast
- Latitude: 41.2725155807393
- Longitude: -124.078448227536
ESU
- Southern Oregon/Northern California Coast Coho Salmon ESU
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 86,424.00
- . . C.0.b
Length of stream treated/protected .10
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Cline R., Redwood National Park. Strawberry Creek Watershed Assessment. 1992. |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.2
Fish Passage ImprovementY (Y/N)
- . . . . C.2.a
Fish Passage Funding 86,423.50
- . . . . C.2.b.1
Length of stream made accessible .10
- . . . . C.2.b.3
Type of blockage/barrier (LOV)
- . . . . C.2.b.4
Number of blockages/impediments/barriers impeding passage 1
- . . . . C.2.f.1
Culvert installed or improved at road stream crossingY (Y/N)
- . . . . . . C.2.f.2
Number of culverts installed or improved 1
- . . . . . . C.2.f.3
Miles of stream made accessible by culvert installation/upgrade .10
7210227
- Worksite Identifier: 7210227
- Start Date:
- End Date:
Area Description
Strawberry Creek - upslope crossing 13
Location Information
- Basin: Northern California Coastal (180101)
- Subbasin:
- Watershed:
- Subwatershed:
- State: California
- Recovery Domain: N Central California Coast
- Latitude: 41.271935
- Longitude: -124.075015
ESU
- Southern Oregon/Northern California Coast Coho Salmon ESU
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 86,424.00
- . . C.0.b
Length of stream treated/protected .10
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Cline R., Redwood National Park. Strawberry Creek Watershed Assessment. 1992. |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.2
Fish Passage ImprovementY (Y/N)
- . . . . C.2.a
Fish Passage Funding 86,423.50
- . . . . C.2.b.1
Length of stream made accessible .10
- . . . . C.2.b.3
Type of blockage/barrier (LOV)
- . . . . C.2.b.4
Number of blockages/impediments/barriers impeding passage 1
- . . . . C.2.f.1
Culvert installed or improved at road stream crossingY (Y/N)
- . . . . . . C.2.f.2
Number of culverts installed or improved 1
- . . . . . . C.2.f.3
Miles of stream made accessible by culvert installation/upgrade .10
7210166
- Worksite Identifier: 7210166
- Start Date:
- End Date:
Area Description
Strawberry Creek - RNSP Reach
Location Information
- Basin: Northern California Coastal (180101)
- Subbasin:
- Watershed:
- Subwatershed:
- State: California
- Recovery Domain: N Central California Coast
- Latitude: 41.2762569772067
- Longitude: -124.079049042356
ESU
- Southern Oregon/Northern California Coast Coho Salmon ESU
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 172,847.00
- . . C.0.b
Length of stream treated/protected 1.00
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Cline R., Redwood National Park. Strawberry Creek Watershed Assessment. 1992. |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.2
Fish Passage ImprovementY (Y/N)
- . . . . C.2.a
Fish Passage Funding 86,423.00
- . . . . C.2.b.1
Length of stream made accessible .50
- . . . . C.2.b.3
Type of blockage/barrier (LOV)
- . . . . C.2.b.4
Number of blockages/impediments/barriers impeding passage 1
- . . . . C.2.f.1
Culvert installed or improved at road stream crossingY (Y/N)
- . . . . . . C.2.f.2
Number of culverts installed or improved 1
- . . . . . . C.2.f.3
Miles of stream made accessible by culvert installation/upgrade .00
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 86,423.50
- . . . . C.4.b
Total length of instream habitat treated 1.00
- . . . . C.4.c.1
Channel reconfiguration and connectivityY (Y/N)
- . . . . . . C.4.c.2
Type of change to channel configuration and connectivity (LOV)
- . . . . . . C.4.c.3
Miles of stream treated for channel reconfiguration and connectivity 1.00
- . . . . . . C.4.c.4
Miles of off-channel stream created through channel reconfiguration and connectivity 1.00
- . . . . . . C.4.c.6
Instream pools created/added through channel reconfiguration and connectivity 0
|
|