Mission Creek Fish Passage Project - Tallant Road Bridge

Salmonid Habitat Restoration and Acquisition

Fish Passage Improvement Instream Habitat
Project ID723327
Recovery DomainsS. California - S. Central CA Coast
Start Date06/07/2010
End Date05/01/2012
Year2009
StatusCompleted
Last Edited05/08/2024
 
1 - 1

Description    


Modify concrete grade control structure at the Tallant Road bridge to improve fish passage.

Project Benefit    


The primary goal of the project is to improve upstream migration of the endangered steelhead trout in order to provide access to their historic spawning grounds and eventually restore a healthy population of steelhead in Mission Creek.

Accomplishments

Metric Completed Originally
Proposed
Instream Habitat
  Stream Miles Treated .06 .06
Fish Passage
  Barriers Removed
  Miles Opened 2.00 2.00

Funding Details

SourceFunds
State$395,678
Other$184,755
Report Total:$580,433


Project Map



Worksites

7209117    


  • Worksite Identifier: 7209117
  • Start Date:
  • End Date:
Area Description
Tallant Road Bridge

Location Information

  • Basin: Central California Coastal (180600)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: California
  • Recovery Domain: S. California - S. Central CA Coast
  • Latitude: 34.43215
  • Longitude: -119.726982

ESU

  • Southern California Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 580,433.00
    •      . . C.0.b Length of stream treated/protected .06
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Steelhead Assessment and Recovery Opportunities in Southern Santa Barbara County, CA. Stoecker and Conception Coast 2002
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.a Fish Passage Funding 290,216.00
      •      . . . . C.2.b.1 Length of stream made accessible 2.00
      •      . . . . C.2.b.3 Type of blockage/barrier (LOV)
      •      . . . . C.2.b.4 Number of blockages/impediments/barriers impeding passage 2
      •      . . . . C.2.g.1 Bridge installed or improved at road stream crossingY (Y/N)
        •      . . . . . . C.2.g.2 Number of bridges installed or improved/upgraded 2
        •      . . . . . . C.2.g.3 Miles of stream made accessible by bridge installation or improvement/upgrade 2.00
      •      . . C.4 Instream Habitat ProjectY (Y/N)
        •      . . . . C.4.a Instream Habitat Funding 290,217.00
        •      . . . . C.4.b Total length of instream habitat treated .06
        •      . . . . C.4.c.1 Channel reconfiguration and connectivityY (Y/N)
          •      . . . . . . C.4.c.2 Type of change to channel configuration and connectivity (LOV)
          •      . . . . . . C.4.c.3 Miles of stream treated for channel reconfiguration and connectivity .06
          •      . . . . . . C.4.c.4 Miles of off-channel stream created through channel reconfiguration and connectivity .00
          •      . . . . . . C.4.c.6 Instream pools created/added through channel reconfiguration and connectivity 3