Ojai Valley Trail Bridge
Salmonid Habitat Restoration and Acquisition
|
723113 | S. California - S. Central CA Coast | 06/22/2009 | 01/15/2013 | 2008 | Completed | 05/08/2024 | |
| |
Description
Remove arundo, existing concrete box culverts, asphalt trail, and rip rap. Contruct three concrete piers and two abutments. Installed pre fabricated steel truss bridge with deck and ramp. Erosion control fabric placed on re countoured slopes.
Project Benefit
Improve: Fish passage and habitat conditions.
Accomplishments
Instream Habitat |
Stream Miles Treated |
.06 |
.06 |
Fish Passage |
Barriers Removed |
1 |
1 |
Miles Opened |
15.00 |
15.00 |
Funding Details |
PCSRF | $482,234 |
State | $9,432 |
Report Total: | $491,666 |
|
| |
Worksites
7208518
- Worksite Identifier: 7208518
- Start Date:
- End Date:
Area Description
San Antonio Creek - Ojai Valley Trail Crossing (fish passage improvement)
Location Information
- Basin: Ventura-San Gabriel Coastal (180701)
- Subbasin:
- Watershed: Ventura River
- Subwatershed:
- State: California
- Recovery Domain: S. California - S. Central CA Coast
- Latitude: 34.379821
- Longitude: -119.307122
ESU
- Southern California Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 491,666.00
- . . C.0.b
Length of stream treated/protected .06
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Entrix, 2003, Ventura River Watershed Technical Investigation (VRWTI) Steelhead Recovery Summary Report & Recommendations, CDFG, Ventura, CA |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.2
Fish Passage ImprovementY (Y/N)
- . . . . C.2.a
Fish Passage Funding 245,833.00
- . . . . C.2.b.1
Length of stream made accessible 15.00
- . . . . C.2.b.3
Type of blockage/barrier (LOV)
- . . . . C.2.b.4
Number of blockages/impediments/barriers impeding passage 1
- . . . . C.2.c.1
Fish passage blockages removed or altered (other than road crossings reported in C.2.f to C.2.i)Y (Y/N)
- . . . . . . C.2.c.2
Number of blockages/impediments/barriers removed/altered 1
- . . . . C.2.g.1
Bridge installed or improved at road stream crossingY (Y/N)
- . . . . . . C.2.g.2
Number of bridges installed or improved/upgraded 1
- . . . . . . C.2.g.3
Miles of stream made accessible by bridge installation or improvement/upgrade 15.00
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 245,833.00
- . . . . C.4.b
Total length of instream habitat treated .06
- . . . . C.4.e.1
Streambank stabilization Y (Y/N)
- . . . . . . C.4.e.2
Material Used For Streambank Stabilization (LOV)
- . . . . . . C.4.e.3
Miles of streambank stabilized .06
|
|