L50 Habitat Restoration & LSC-3 Diversion Removal
Salmonid Habitat Restoration and Acquisition
|
015 10 SA | Snake River | 10/11/2012 | 12/31/2012 | 2010 | Completed | 05/08/2024 | |
| |
Description
Previously a 1.8 cfs water right was delivered via the Lemhi River L-50 diversion for 0.3 miles to be comingled into Lemhi Little Springs Creek (LLSC). The comingled water conveyed another 1.2 miles in LLSC, then was re-diverted from LLSC at the LSC-3 diversion into an unscreened open ditch for 2.8 miles to the point of use, traveling a total of 4.3 miles. As part of this project, the landowner exchanged the point of diversion (POD) from L-50 and LSC-3 to an existing screened diversion, L46a, effectively closing L-50 and LSC-3. This improved Lemhi River stream flow by 0.9 cfs (652 acre-feet/year). The L-50 POD was not a fish passage barrier, but was removed as part of improving flow. A total of approximately 1.08 miles of stream is protected for sufficient flow for spawning and rearing habitat. The open ditch irrigation system was converted to a pressurized pivot sprinkler system. The existing 49.2 acre irrigation footprint remains the same. A pump station, pivot and 960 feet (0.18182 miles) of irrigation pipeline were installed. The new irrigation system improved water conveyance and distribution efficiency. The fish passage barrier at the LSC-3 (diversion) was removed by the landowner thereby preventing fish entrainment in the unscreened diversion. A total of 2.7 miles of stream was made accessible by removing this fish passage barrier. The objective of this project was to close and remove both the L-50 diversion from the Lemhi River LSC3 diversion (fish passage barrier) on LLSC. This project was another step in the reconnection of LLSC with the Lemhi River.
Project Benefit
The actions from this project will improve fish migration and remove the possibility of entrainment for ESA-listed species.
Accomplishments
Fish Passage |
Barriers Removed |
1 |
2 |
Miles Opened |
2.70 |
2.70 |
Funding Details |
PCSRF | $79,920 |
Other | $35,362 |
In-Kind Donated Labor | $230 |
In-Kind Other | $270 |
Report Total: | $115,782 |
|
| |
Worksites
L-50 & LSC-3 Div Rem
- Worksite Identifier: L-50 & LSC-3 Div Rem
- Start Date: 10/11/2012
- End Date: 12/31/2012
Area Description
Salmon Subbasin, Lemhi 4th field HUC and Lemhi Little Springs Creek watershed
Location Information
- Basin: Salmon (170602)
- Subbasin:
- Watershed:
- Subwatershed:
- State: Idaho
- Recovery Domain: Snake River
- Latitude: 44.76828
- Longitude: -113.51296
ESU
- Snake River Basin Steelhead DPS
- Snake River Spring/Summer-run Chinook Salmon ESU
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 115,782.00
- . . C.0.b
Length of stream treated/protected 1.08
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Salmon Subbasin Management Plan, Ecovista, 2004, NWPPC, Portland Oregon |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.2
Fish Passage ImprovementY (Y/N)
- . . . . C.2.a
Fish Passage Funding 500.00
- . . . . C.2.b.1
Length of stream made accessible 2.70
- . . . . C.2.b.3
Type of blockage/barrier (LOV)
- . . . . C.2.b.4
Number of blockages/impediments/barriers impeding passage 1
- . . . . C.2.c.1
Fish passage blockages removed or altered (other than road crossings reported in C.2.f to C.2.i)Y (Y/N)
- . . . . . . C.2.c.2
Number of blockages/impediments/barriers removed/altered 1
- . . C.3
Instream Flow ProjectY (Y/N)
- . . . . C.3.a
Instream Flow Funding 115,282.00
- . . . . C.3.b
Length of stream 'protected' for adequate flow 1.08
- . . . . C.3.c
Change in water flow.9 (cfs)
- . . . . C.3.d.1
Water flow gaugesY (Y/N)
- . . . . . . C.3.d.2
Number of water flow gauges 1
- . . . . C.3.e.1
Irrigation practice improvementY (Y/N)
- . . . . . . C.3.e.2
Acre feet of water conserved per year652 (Acre feet)
- . . . . . . C.3.e.4
Initial start date of action or agreement10/22/2012 (mm/dd/yyyy)
- . . . . . . C.3.e.5
Final end date of action or agreement12/31/9999 (mm/dd/yyyy)
|
|