Solstice Creek Habitat Enhancement Project

Salmonid Habitat Restoration and Acquisition

Instream Habitat
Project ID722834
Recovery DomainsS. California - S. Central CA Coast
Start Date05/01/2008
End Date12/16/2011
Year2007
StatusCompleted
Last Edited01/26/2024
 
1 - 1

Description    


The applicant was unable to install 4 of the 5 structures. 3 of the sites changed and the instream habitat components were no longer needed. 1 site was not installed due to time constraints due to permit issues. Site 4 was completed, LWD and two pools.

Project Benefit    


This project will install five instrream structures (large woody debris) in Solstice Creek that will create pools and provide over-summering/rearing cover for juvenile steelhead. It will also serve as a demonstration project for stakeholders in southern California who are interested in installing bioengineering structures for restoration purposes.

Accomplishments

Metric Completed Originally
Proposed
Instream Habitat
  Stream Miles Treated .50 .50

Funding Details

SourceFunds
State$6,519
Report Total:$6,519


Project Map



Worksites

7208179    


  • Worksite Identifier: 7208179
  • Start Date:
  • End Date:
Area Description
Solstice Creek - instream habitat enhancement (Site 4 only)

Location Information

  • Basin: Ventura-San Gabriel Coastal (180701)
  • Subbasin:
  • Watershed: Big Sycamore Canyon-Frontal Santa Monica Bay
  • Subwatershed:
  • State: California
  • Recovery Domain: S. California - S. Central CA Coast
  • Latitude: 34.042316
  • Longitude: -118.753407

ESU

  • Southern California Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 6,519.00
    •      . . C.0.b Length of stream treated/protected .50
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      N/A
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 6,519.37
      •      . . . . C.4.b Total length of instream habitat treated .50
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .01
        •      . . . . . . C.4.d.5 Pools expected to be created through channel structure placement 2
        •      . . . . . . C.4.d.7 Number of structures placed in channel 1