Walters Creek Phase II Irrigation Adaptive Management
Salmonid Habitat Restoration and Acquisition
|
723022 | S. California - S. Central CA Coast | 07/01/2007 | 12/31/2008 | 2006 | Completed | 01/26/2024 | |
| |
Description
Installed and maintained a temporary irrigation system to water plants during a two-year establishment period in the re-vegetated riparian corridor and floodplain of the “Walters Creek Riparian Restoration Project Phase II”.
Project Benefit
As a result of increasing riparian and floodplain vegetation, steelhead will have enhanced habitat in the form of increased instream and overhead cover, and stream shade. Improve spawning and rearing habitat for steelhead.
Funding Details |
State | $24,156 |
Report Total: | $24,156 |
|
| |
Worksites
7208216
- Worksite Identifier: 7208216
- Start Date:
- End Date:
Area Description
Walters Creek at Chorro Creek (SLO County)
Location Information
- Basin: Central California Coastal (180600)
- Subbasin:
- Watershed: Morro Creek-Frontal Pacific Ocean
- Subwatershed:
- State: California
- Recovery Domain: S. California - S. Central CA Coast
- Latitude: 35.3419
- Longitude: -120.767856
ESU
- South-Central California Coast Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 24,156.00
- . . C.0.b
Length of stream treated/protected .23
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
N/A |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.11
Site maintenance projectY (Y/N)
- . . . . C.11.a
Site maintenance funding 24,156.00
- . . . . C.11.c.1
Restored upland area maintainedY (Y/N)
- . . . . . . C.11.c.2
Acres of restored land maintained. 4.0
|
|