Kruger-Bridge Creek Inn Bank Restoration
Salmonid Habitat Restoration and Acquisition
|
722429 | S. California - S. Central CA Coast | 08/01/2006 | 09/14/2006 | 2004 | Completed | 01/26/2024 | |
| |
Description
Bank stabilized to 2:1 slope, covered w/coir fabric, revegetated w/native species, drip irrigation system installed. Left bank stabilized with log deflector and toe-of slope rock structure. Non-native vegetation removed. Gravel bar redistributed.
Project Benefit
The project will prevent further bank erosion which was causing accelerated sediment input to the creek and threatening a structure. Instream flow conditions will be improved and non-native vegetation will be replaced with native species.
Accomplishments
Instream Habitat |
Stream Miles Treated |
.04 |
.04 |
Funding Details |
PCSRF | $7,080 |
Report Total: | $7,080 |
|
| |
Worksites
7207705
- Worksite Identifier: 7207705
- Start Date:
- End Date:
Area Description
Corral de Piedra Creek - San Luis Obispo County (bank stabilization)
Location Information
- Basin: Central California Coastal (180600)
- Subbasin:
- Watershed: Pismo Creek-Frontal Pacific Ocean
- Subwatershed:
- State: California
- Recovery Domain: S. California - S. Central CA Coast
- Latitude: 35.236588
- Longitude: -120.591415
ESU
- South-Central California Coast Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 7,080.00
- . . C.0.b
Length of stream treated/protected .04
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
N/A |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 7,080.00
- . . . . C.4.b
Total length of instream habitat treated .04
- . . . . C.4.e.1
Streambank stabilization Y (Y/N)
- . . . . . . C.4.e.2
Material Used For Streambank Stabilization (LOV)
- . . . . . . C.4.e.3
Miles of streambank stabilized .04
|
|