Muddy Creek and Grouse Tree Instream Project

Salmonid Habitat Restoration and Acquisition

Instream Habitat
Project ID721979
Recovery DomainsN Central California Coast
Start Date06/01/2005
End Date11/15/2008
Year2004
StatusCompleted
Last Edited01/26/2024
 
1 - 1

Description    


Improved 2400 of habitat in two reaches of Price Creek at 20 locations utilizing 13 logs, 30 rootwads (22 live), and 710 tons of boulder. Stabilized 450 of stream bank.

Project Benefit    


Improve: Excessive sediment, Physical spawning habitat, Escape cover/shelter

Accomplishments

Metric Completed Originally
Proposed
Instream Habitat
  Stream Miles Treated .49 .49

Funding Details

SourceFunds
State$103,416
Report Total:$103,416


Project Map



Worksites

7206366    


  • Worksite Identifier: 7206366
  • Start Date:
  • End Date:
Area Description
Price Creek - Muddy Creek Reach (instream habitat structures/bank stabilization)

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin:
  • Watershed: Price Creek-Eel River
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 40.50187
  • Longitude: -124.210755

ESU

  • Southern Oregon/Northern California Coast Coho Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 51,708.00
    •      . . C.0.b Length of stream treated/protected .15
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Strategy for the recovery of California Coho Salmon (CDFG 2004); Eel River Salmon and Steelhead Restoration Action Plan (CDFG 1996)
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 51,708.24
      •      . . . . C.4.b Total length of instream habitat treated .15
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .15
        •      . . . . . . C.4.d.5 Pools expected to be created through channel structure placement 0
        •      . . . . . . C.4.d.7 Number of structures placed in channel 11
      •      . . . . C.4.e.1 Streambank stabilization Y (Y/N)
        •      . . . . . . C.4.e.2 Material Used For Streambank Stabilization (LOV)
        •      . . . . . . C.4.e.3 Miles of streambank stabilized .15

7206367    


  • Worksite Identifier: 7206367
  • Start Date:
  • End Date:
Area Description
Price Creek - Grouse Creek Reach (instream habitat structures)

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin:
  • Watershed: Price Creek-Eel River
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 40.514322
  • Longitude: -124.198294

ESU

  • Southern Oregon/Northern California Coast Coho Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 51,708.00
    •      . . C.0.b Length of stream treated/protected .30
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Strategy for the recovery of California Coho Salmon (CDFG 2004); Eel River Salmon and Steelhead Restoration Action Plan (CDFG 1996)
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 51,708.24
      •      . . . . C.4.b Total length of instream habitat treated .34
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .34
        •      . . . . . . C.4.d.5 Pools expected to be created through channel structure placement 0
        •      . . . . . . C.4.d.7 Number of structures placed in channel 9
      •      . . . . C.4.e.1 Streambank stabilization Y (Y/N)
        •      . . . . . . C.4.e.2 Material Used For Streambank Stabilization (LOV)
        •      . . . . . . C.4.e.3 Miles of streambank stabilized .03