Fiscalini Bank Stabilization Enhancement
Salmonid Habitat Restoration and Acquisition
|
721908 | S. California - S. Central CA Coast | 07/01/2005 | 12/31/2006 | 2004 | Completed | 01/26/2024 | |
| |
Description
Stabilize section of eroding left bank, 350 ft long and 30 ft high, relocate channel, install flow deflectors, instream structure, boulder toe protection, reconstruction and re-slope bank, riparian revegetaion, and exclusion fencing.
Project Benefit
Improve habitat by controlling stream bank erosion, establishing native riparian vegetation on the newly created creek bank, and reducing surface run-off and pesticide input into the creek by a buffer zone created along the length of the agricultural field at the top of the creek bank. These measures will ultimately yield long term benefits to steelhead by decreasing sediment input directly into the creek and establishing a vegetative canopy to help reduce stream water temperatures and increase food production at this site.
Accomplishments
Instream Habitat |
Stream Miles Treated |
.07 |
.07 |
Funding Details |
State | $15,529 |
Report Total: | $15,529 |
|
| |
Worksites
7206011
- Worksite Identifier: 7206011
- Start Date:
- End Date:
Area Description
Santa Rosa Creek - Fiscalini site (bank stabilization)
Location Information
- Basin: Central California Coastal (180600)
- Subbasin:
- Watershed: Santa Rosa Creek-Frontal Pacific Ocean
- Subwatershed:
- State: California
- Recovery Domain: S. California - S. Central CA Coast
- Latitude: 35.569435
- Longitude: -121.063354
ESU
- South-Central California Coast Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 15,529.00
- . . C.0.b
Length of stream treated/protected .07
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Section 4(a)(1) of the ESA |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 15,529.01
- . . . . C.4.b
Total length of instream habitat treated .07
- . . . . C.4.d.1
Channel structure placementY (Y/N)
- . . . . . . C.4.d.2
Material used for channel structure (LOV)
- . . . . . . C.4.d.3
Miles of stream treated through channel structure placement .07
- . . . . . . C.4.d.5
Pools expected to be created through channel structure placement 0
- . . . . . . C.4.d.7
Number of structures placed in channel 3
- . . . . C.4.e.1
Streambank stabilization Y (Y/N)
- . . . . . . C.4.e.2
Material Used For Streambank Stabilization (LOV)
- . . . . . . C.4.e.3
Miles of streambank stabilized .07
|
|