Mill Creek Coho Salmon Habitat Enhancement Project
Salmonid Habitat Restoration and Acquisition
|
721690 | N Central California Coast | 06/01/2006 | 03/31/2008 | 2005 | Completed | 01/26/2024 | |
| |
Description
Project was re-designed to produce 10 instream structures within the project reach. The removal of the crushed culvert was not implemented.
Project Benefit
Improve: Physical spawning habitat, Escape cover/shelter
Accomplishments
Instream Habitat |
Stream Miles Treated |
.02 |
.02 |
Funding Details |
State | $32,902 |
Report Total: | $32,902 |
|
| |
Worksites
7207026
- Worksite Identifier: 7207026
- Start Date:
- End Date:
Area Description
Mill Creek (Navarro R. tributary) - instream habitat structures
Location Information
- Basin: Northern California Coastal (180101)
- Subbasin:
- Watershed: Navarro River
- Subwatershed:
- State: California
- Recovery Domain: N Central California Coast
- Latitude: 39.120831
- Longitude: -123.507577
ESU
- Central California Coast Coho Salmon ESU
- Northern California Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 32,902.00
- . . C.0.b
Length of stream treated/protected .02
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Navarro Watershed Restoration Plan (1998) |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 32,902.00
- . . . . C.4.b
Total length of instream habitat treated .02
- . . . . C.4.d.1
Channel structure placementY (Y/N)
- . . . . . . C.4.d.2
Material used for channel structure (LOV)
- . . . . . . C.4.d.3
Miles of stream treated through channel structure placement .00
- . . . . . . C.4.d.5
Pools expected to be created through channel structure placement 0
- . . . . . . C.4.d.7
Number of structures placed in channel 10
|
|