Mill Creek Coho Salmon Habitat Enhancement Project

Salmonid Habitat Restoration and Acquisition

Instream Habitat
Project ID721690
Recovery DomainsN Central California Coast
Start Date06/01/2006
End Date03/31/2008
Year2005
StatusCompleted
Last Edited01/26/2024
 
1 - 1

Description    


Project was re-designed to produce 10 instream structures within the project reach. The removal of the crushed culvert was not implemented.

Project Benefit    


Improve: Physical spawning habitat, Escape cover/shelter

Accomplishments

Metric Completed Originally
Proposed
Instream Habitat
  Stream Miles Treated .02 .02

Funding Details

SourceFunds
State$32,902
Report Total:$32,902


Project Map



Worksites

7207026    


  • Worksite Identifier: 7207026
  • Start Date:
  • End Date:
Area Description
Mill Creek (Navarro R. tributary) - instream habitat structures

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin:
  • Watershed: Navarro River
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 39.120831
  • Longitude: -123.507577

ESU

  • Central California Coast Coho Salmon ESU
  • Northern California Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 32,902.00
    •      . . C.0.b Length of stream treated/protected .02
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Navarro Watershed Restoration Plan (1998)
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 32,902.00
      •      . . . . C.4.b Total length of instream habitat treated .02
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .00
        •      . . . . . . C.4.d.5 Pools expected to be created through channel structure placement 0
        •      . . . . . . C.4.d.7 Number of structures placed in channel 10