Salmon Creek Bank Stabilization Project

Salmonid Habitat Restoration and Acquisition

Fish Passage Improvement Instream Habitat
Project ID720041
Recovery DomainsN Central California Coast
Start Date02/01/2002
End Date03/31/2003
Year2000
StatusCompleted
Last Edited01/27/2024
 
1 - 1

Description    


Controlled bank erosion at a site in Salmon Creek by repositioning downed alder. Willow cuttings were planted as feasible on the eroding bank to help revegetate the bank.

Project Benefit    


Control bank erosion at a site in Salmon Creek without causing take of California freshwater shrimp or their habitat.

Accomplishments

Metric Completed Originally
Proposed
Instream Habitat
  Stream Miles Treated .05 .05
Fish Passage
  Barriers Removed 1 1
  Miles Opened .00 .00

Funding Details

SourceFunds
State$2,484
Report Total:$2,484


Project Map



Worksites

7200223    


  • Worksite Identifier: 7200223
  • Start Date:
  • End Date:
Area Description
Salmon Creek - bank stabilization/barrier modification

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin:
  • Watershed: Salmon Creek-Frontal Pacific Ocean
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 38.355233
  • Longitude: -122.922937

ESU

  • Central California Coast Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 2,484.00
    •      . . C.0.b Length of stream treated/protected .05
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      N/A
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.a Fish Passage Funding 1,242.00
      •      . . . . C.2.b.1 Length of stream made accessible .00
      •      . . . . C.2.b.3 Type of blockage/barrier (LOV)
      •      . . . . C.2.b.4 Number of blockages/impediments/barriers impeding passage 1
      •      . . . . C.2.c.1 Fish passage blockages removed or altered (other than road crossings reported in C.2.f to C.2.i)Y (Y/N)
        •      . . . . . . C.2.c.2 Number of blockages/impediments/barriers removed/altered 1
      •      . . C.4 Instream Habitat ProjectY (Y/N)
        •      . . . . C.4.a Instream Habitat Funding 1,242.00
        •      . . . . C.4.b Total length of instream habitat treated .05
        •      . . . . C.4.e.1 Streambank stabilization Y (Y/N)
          •      . . . . . . C.4.e.2 Material Used For Streambank Stabilization (LOV)
          •      . . . . . . C.4.e.3 Miles of streambank stabilized .05