Ackerman Creek Enhancement

Salmonid Habitat Restoration and Acquisition

Instream Habitat
Project ID720037
Recovery DomainsN Central California Coast
Start Date07/01/2003
End Date03/31/2003
Year2000
StatusCompleted
Last Edited01/27/2024
 
1 - 1

Description    


Protected unstable streambanks, increased canopy by constructing a 300-foot willow brush mattress and installed a series of boulder wing deflectors.

Project Benefit    


yield long term benefits to steelhead by decreasing sediment and providing canopy to reduce water temperatures

Accomplishments

Metric Completed Originally
Proposed
Instream Habitat
  Stream Miles Treated .06 .06

Funding Details

SourceFunds
State$5,000
Report Total:$5,000


Project Map



Worksites

7200218    


  • Worksite Identifier: 7200218
  • Start Date:
  • End Date:
Area Description
Ackerman Creek - riparian enhancement

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin:
  • Watershed: Upper Russian River
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 39.18524
  • Longitude: -123.292522

ESU

  • Central California Coast Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 5,000.00
    •      . . C.0.b Length of stream treated/protected .06
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      N/A
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 4,999.93
      •      . . . . C.4.b Total length of instream habitat treated .06
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .06
        •      . . . . . . C.4.d.5 Pools expected to be created through channel structure placement 0
        •      . . . . . . C.4.d.7 Number of structures placed in channel 3
      •      . . . . C.4.e.1 Streambank stabilization Y (Y/N)
        •      . . . . . . C.4.e.2 Material Used For Streambank Stabilization (LOV)
        •      . . . . . . C.4.e.3 Miles of streambank stabilized .06