Installed 1 weir, 1 J-hook, 1 set of boulder clusters, and 1 downstream digger log to reduce streambank erosion, create pools, increase cover, and enhance habitat for salmonids in the Pena Creek Watershed.

Project Benefit    


Reduce erosion of the streambanks, create pools, increase cover, and enhance habitat for salmonid species within the Pena Creek watershed.

Accomplishments

Metric Completed Originally
Proposed
Instream Habitat
  Stream Miles Treated .28 .28

Funding Details

SourceFunds
State$4,796
Report Total:$4,796


Project Map



Worksites

7200216    


  • Worksite Identifier: 7200216
  • Start Date:
  • End Date:
Area Description
Pena Creek - instream habitat structures

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin:
  • Watershed: Dry Creek
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 38.655118
  • Longitude: -123.002326

ESU

  • Central California Coast Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 4,796.00
    •      . . C.0.b Length of stream treated/protected .28
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      N/A
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 4,796.00
      •      . . . . C.4.b Total length of instream habitat treated .28
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .28
        •      . . . . . . C.4.d.5 Pools expected to be created through channel structure placement 0
        •      . . . . . . C.4.d.7 Number of structures placed in channel 4