Skyline Pipe Arch Supplemental
Salmonid Habitat Restoration and Acquisition
|
720017 | N Central California Coast | 10/01/2001 | 03/31/2003 | 2000 | Completed | 01/27/2024 | |
| |
Description
Increased size of boulder grade control structures by adding 20 cubic yards of boulders. Excavated 150 cubic yards of sediment perched above the culvert. Constructed a redwood log grade control structure.
Project Benefit
Improve fish passage and control erosion at two sites on Seely Creek
Accomplishments
Instream Habitat |
Stream Miles Treated |
.10 |
.10 |
Fish Passage |
Barriers Removed |
1 |
1 |
Miles Opened |
2.00 |
2.00 |
Funding Details |
State | $2,490 |
Report Total: | $2,490 |
|
| |
Worksites
7200354
- Worksite Identifier: 7200354
- Start Date:
- End Date:
Area Description
Seely Creek tributary - Sites 1-2 (fish passage improvement)
Location Information
- Basin: Northern California Coastal (180101)
- Subbasin:
- Watershed: Lower South Fork Eel River
- Subwatershed:
- State: California
- Recovery Domain: N Central California Coast
- Latitude: 40.151316
- Longitude: -123.865843
ESU
- Southern Oregon/Northern California Coast Coho Salmon ESU
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 2,490.00
- . . C.0.b
Length of stream treated/protected .10
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
N/A |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.2
Fish Passage ImprovementY (Y/N)
- . . . . C.2.a
Fish Passage Funding 1,245.00
- . . . . C.2.b.1
Length of stream made accessible 2.00
- . . . . C.2.b.3
Type of blockage/barrier (LOV)
- . . . . C.2.b.4
Number of blockages/impediments/barriers impeding passage 1
- . . . . C.2.c.1
Fish passage blockages removed or altered (other than road crossings reported in C.2.f to C.2.i)Y (Y/N)
- . . . . . . C.2.c.2
Number of blockages/impediments/barriers removed/altered 1
- . . . . C.2.f.1
Culvert installed or improved at road stream crossingY (Y/N)
- . . . . . . C.2.f.2
Number of culverts installed or improved 1
- . . . . . . C.2.f.3
Miles of stream made accessible by culvert installation/upgrade .00
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 1,245.00
- . . . . C.4.b
Total length of instream habitat treated .10
- . . . . C.4.d.1
Channel structure placementY (Y/N)
- . . . . . . C.4.d.2
Material used for channel structure (LOV)
- . . . . . . C.4.d.3
Miles of stream treated through channel structure placement .10
- . . . . . . C.4.d.5
Pools expected to be created through channel structure placement 0
- . . . . . . C.4.d.7
Number of structures placed in channel 2
|
|