Skyline Pipe Arch Supplemental

Salmonid Habitat Restoration and Acquisition

Fish Passage Improvement Instream Habitat
Project ID720017
Recovery DomainsN Central California Coast
Start Date10/01/2001
End Date03/31/2003
Year2000
StatusCompleted
Last Edited01/27/2024
 
1 - 1

Description    


Increased size of boulder grade control structures by adding 20 cubic yards of boulders. Excavated 150 cubic yards of sediment perched above the culvert. Constructed a redwood log grade control structure.

Project Benefit    


Improve fish passage and control erosion at two sites on Seely Creek

Accomplishments

Metric Completed Originally
Proposed
Instream Habitat
  Stream Miles Treated .10 .10
Fish Passage
  Barriers Removed 1 1
  Miles Opened 2.00 2.00

Funding Details

SourceFunds
State$2,490
Report Total:$2,490


Project Map



Worksites

7200354    


  • Worksite Identifier: 7200354
  • Start Date:
  • End Date:
Area Description
Seely Creek tributary - Sites 1-2 (fish passage improvement)

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin:
  • Watershed: Lower South Fork Eel River
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 40.151316
  • Longitude: -123.865843

ESU

  • Southern Oregon/Northern California Coast Coho Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 2,490.00
    •      . . C.0.b Length of stream treated/protected .10
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      N/A
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.a Fish Passage Funding 1,245.00
      •      . . . . C.2.b.1 Length of stream made accessible 2.00
      •      . . . . C.2.b.3 Type of blockage/barrier (LOV)
      •      . . . . C.2.b.4 Number of blockages/impediments/barriers impeding passage 1
      •      . . . . C.2.c.1 Fish passage blockages removed or altered (other than road crossings reported in C.2.f to C.2.i)Y (Y/N)
        •      . . . . . . C.2.c.2 Number of blockages/impediments/barriers removed/altered 1
      •      . . . . C.2.f.1 Culvert installed or improved at road stream crossingY (Y/N)
        •      . . . . . . C.2.f.2 Number of culverts installed or improved 1
        •      . . . . . . C.2.f.3 Miles of stream made accessible by culvert installation/upgrade .00
      •      . . C.4 Instream Habitat ProjectY (Y/N)
        •      . . . . C.4.a Instream Habitat Funding 1,245.00
        •      . . . . C.4.b Total length of instream habitat treated .10
        •      . . . . C.4.d.1 Channel structure placementY (Y/N)
          •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
          •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .10
          •      . . . . . . C.4.d.5 Pools expected to be created through channel structure placement 0
          •      . . . . . . C.4.d.7 Number of structures placed in channel 2