SF Dobbyn Creek Boulder Deflector
Salmonid Habitat Restoration and Acquisition
|
720015 | N Central California Coast | 08/01/2001 | 03/14/2003 | 2000 | Completed | 01/27/2024 | |
| |
Description
Built a low profile boulder deflector to direct the flow into a single channel.
Project Benefit
Prevent the channel from braiding within a current project reach of SF Dobbyn Creek by constructing a low-profile boulder deflector in the stream channel.
Accomplishments
Instream Habitat |
Stream Miles Treated |
.10 |
.10 |
Funding Details |
State | $2,499 |
Report Total: | $2,499 |
|
| |
Worksites
7200193
- Worksite Identifier: 7200193
- Start Date:
- End Date:
Area Description
Dobbyn Creek, S Fk - instream habitat structures
Location Information
- Basin: Northern California Coastal (180101)
- Subbasin:
- Watershed: Dobbyn Creek
- Subwatershed:
- State: California
- Recovery Domain: N Central California Coast
- Latitude: 40.192005
- Longitude: -123.591505
ESU
- Southern Oregon/Northern California Coast Coho Salmon ESU
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 2,499.00
- . . C.0.b
Length of stream treated/protected .10
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
N/A |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 2,499.00
- . . . . C.4.b
Total length of instream habitat treated .10
- . . . . C.4.d.1
Channel structure placementY (Y/N)
- . . . . . . C.4.d.2
Material used for channel structure (LOV)
- . . . . . . C.4.d.3
Miles of stream treated through channel structure placement .10
- . . . . . . C.4.d.5
Pools expected to be created through channel structure placement 0
- . . . . . . C.4.d.7
Number of structures placed in channel 1
|
|