SF Dobbyn Creek Boulder Deflector

Salmonid Habitat Restoration and Acquisition

Instream Habitat
Project ID720015
Recovery DomainsN Central California Coast
Start Date08/01/2001
End Date03/14/2003
Year2000
StatusCompleted
Last Edited01/27/2024
 
1 - 1

Description    


Built a low profile boulder deflector to direct the flow into a single channel.

Project Benefit    


Prevent the channel from braiding within a current project reach of SF Dobbyn Creek by constructing a low-profile boulder deflector in the stream channel.

Accomplishments

Metric Completed Originally
Proposed
Instream Habitat
  Stream Miles Treated .10 .10

Funding Details

SourceFunds
State$2,499
Report Total:$2,499


Project Map



Worksites

7200193    


  • Worksite Identifier: 7200193
  • Start Date:
  • End Date:
Area Description
Dobbyn Creek, S Fk - instream habitat structures

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin:
  • Watershed: Dobbyn Creek
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 40.192005
  • Longitude: -123.591505

ESU

  • Southern Oregon/Northern California Coast Coho Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 2,499.00
    •      . . C.0.b Length of stream treated/protected .10
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      N/A
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 2,499.00
      •      . . . . C.4.b Total length of instream habitat treated .10
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .10
        •      . . . . . . C.4.d.5 Pools expected to be created through channel structure placement 0
        •      . . . . . . C.4.d.7 Number of structures placed in channel 1