Campbell Creek/Gannon Slough Channel Realignment Tidal - Riparian Restoration Project

Salmonid Habitat Restoration and Acquisition

Fish Passage Improvement Instream Habitat Riparian Habitat
Project ID705275
Recovery DomainsN Central California Coast
Start Date06/01/2004
End Date03/30/2006
Year2003
StatusCompleted
Last Edited05/08/2024
 
1 - 1

Description    


Installed tidegate; reconstructed 780 ft of channel with 6 instream habitat structures (log/boulder combo); installed 4 back-flooding weirs to improve fish passage. Partially completed exclusion fencing and riparian revegetation.

Project Benefit    


Provide fish passage, improve channel habitat and restore riparian area for 11,690 feet of Gannon Slough, Campbell Creek, Beith Creek, Grotzman Creek and Fickle Hill Creeks

Accomplishments

Metric Completed Originally
Proposed
Instream Habitat
  Stream Miles Treated .01 .01
Riparian Habitat
  Stream Miles Treated .38 .38
  Acres Treated .0 .0
Fish Passage
  Barriers Removed
  Miles Opened 3.13 3.13

Funding Details

SourceFunds
PCSRF$145,327
Report Total:$145,327


Project Map



Worksites

7200451    


  • Worksite Identifier: 7200451
  • Start Date:
  • End Date:
Area Description
Gannon Slough - channel realignment/instream/fish passage

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin:
  • Watershed: Humboldt Bay-Frontal Pacific Ocean
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 40.859259
  • Longitude: -124.082005

ESU

  • Southern Oregon/Northern California Coast Coho Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 58,131.00
    •      . . C.0.b Length of stream treated/protected .38
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Humboldt Bay Advisory Council Watershed Restoration Priority Plan
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.a Fish Passage Funding 29,065.45
      •      . . . . C.2.b.1 Length of stream made accessible .38
      •      . . . . C.2.d.1 Fishway chutes or pools installedY (Y/N)
        •      . . . . . . C.2.d.2 Number of fishway chutes/pools installed 0
      •      . . C.4 Instream Habitat ProjectY (Y/N)
        •      . . . . C.4.a Instream Habitat Funding 29,065.45
        •      . . . . C.4.b Total length of instream habitat treated .01
        •      . . . . C.4.d.1 Channel structure placementY (Y/N)
          •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
          •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .01
          •      . . . . . . C.4.d.5 Pools expected to be created through channel structure placement 0
          •      . . . . . . C.4.d.7 Number of structures placed in channel 4
        •      . . . . C.4.e.1 Streambank stabilization Y (Y/N)
          •      . . . . . . C.4.e.2 Material Used For Streambank Stabilization (LOV)
          •      . . . . . . C.4.e.3 Miles of streambank stabilized .01

7200453    


  • Worksite Identifier: 7200453
  • Start Date:
  • End Date:
Area Description
Gannon Slough - riparian plantings

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin:
  • Watershed: Humboldt Bay-Frontal Pacific Ocean
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 40.859247
  • Longitude: -124.081765

ESU

  • Southern Oregon/Northern California Coast Coho Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 29,065.00
    •      . . C.0.b Length of stream treated/protected .38
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Humboldt Bay Advisory Council Watershed Restoration Priority Plan
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.5 Riparian Habitat ProjectY (Y/N)
      •      . . . . C.5.a Riparian Habitat Funding 29,065.45
      •      . . . . C.5.b.1 Total riparian miles streambank treated .38
      •      . . . . C.5.b.2 Total Riparian Acres Treated .0
      •      . . . . C.5.c.1 Riparian plantingY (Y/N)
        •      . . . . . . C.5.c.2
          Species of plants planted in riparian
          native trees and shrubs
        •      . . . . . . C.5.c.3 Acres planted in riparian .0

7200455    


  • Worksite Identifier: 7200455
  • Start Date:
  • End Date:
Area Description
Gannon Slough - tidegate installation/fish passage improvement

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin:
  • Watershed: Humboldt Bay-Frontal Pacific Ocean
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 40.849639
  • Longitude: -124.080606

ESU

  • Southern Oregon/Northern California Coast Coho Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 58,131.00
    •      . . C.0.b Length of stream treated/protected 2.75
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Humboldt Bay Advisory Council Watershed Restoration Priority Plan
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.a Fish Passage Funding 29,065.45
      •      . . . . C.2.b.1 Length of stream made accessible 2.75
      •      . . . . C.2.b.3 Type of blockage/barrier (LOV)
      •      . . . . C.2.b.4 Number of blockages/impediments/barriers impeding passage 1
      •      . . . . C.2.d.1 Fishway chutes or pools installedY (Y/N)
        •      . . . . . . C.2.d.2 Number of fishway chutes/pools installed 0
      •      . . C.9 Estuarine/Nearshore ProjectY (Y/N)
        •      . . . . C.9.a Estuarine/nearshore funding 29,065.45
        •      . . . . C.9.b Total amount of estuarine/nearshore area treated .0
        •      . . . . C.9.e.1 Tidegate alteration/removalY (Y/N)
          •      . . . . . . C.9.e.2 Tidegates altered/removed to allow fish passage 1