Andrews Property Riparian Habitat Improvement Project

Salmonid Habitat Restoration and Acquisition

Instream Habitat Riparian Habitat
Project ID704971
Recovery DomainsS. California - S. Central CA Coast
Start Date05/01/2003
End Date08/13/2004
Year2002
StatusCompleted
Last Edited01/26/2024
 
1 - 1

Description    


Stabilized 650 feet of eroded stream bank, revegetated with native trees and understory vegetation and fenced livestock from 0.65 miles of stream. Increased the number of pools in the project reach to balance pool to riffle ratios.

Project Benefit    


Improve: Water quality (including temperature), Riparian dysfunction, Excessive sediment, Physical spawning habitat, Escape cover/shelter

Accomplishments

Metric Completed Originally
Proposed
Instream Habitat
  Stream Miles Treated 1.03 1.03
Riparian Habitat
  Stream Miles Treated 2.67 2.67
  Acres Treated .0 .0

Funding Details

SourceFunds
State$134,119
Report Total:$134,119


Project Map



Worksites

7004294    


  • Worksite Identifier: 7004294
  • Start Date:
  • End Date:
Area Description
San Luis Obispo Creek - site AND 1-9 (bank stabilization/riparian restoration)

Location Information

  • Basin: Central California Coastal (180600)
  • Subbasin:
  • Watershed: Morro Creek-Frontal Pacific Ocean
  • Subwatershed:
  • State: California
  • Recovery Domain: S. California - S. Central CA Coast
  • Latitude: 35.297608
  • Longitude: -120.626357

ESU

  • South-Central California Coast Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 89,412.00
    •      . . C.0.b Length of stream treated/protected 1.03
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      N/A
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 44,706.22
      •      . . . . C.4.b Total length of instream habitat treated 1.03
      •      . . . . C.4.e.1 Streambank stabilization Y (Y/N)
        •      . . . . . . C.4.e.2 Material Used For Streambank Stabilization (LOV)
        •      . . . . . . C.4.e.3 Miles of streambank stabilized 1.03
      •      . . C.5 Riparian Habitat ProjectY (Y/N)
        •      . . . . C.5.a Riparian Habitat Funding 44,706.22
        •      . . . . C.5.b.1 Total riparian miles streambank treated 2.60
        •      . . . . C.5.b.2 Total Riparian Acres Treated .0
        •      . . . . C.5.c.1 Riparian plantingY (Y/N)
          •      . . . . . . C.5.c.2
            Species of plants planted in riparian
            native trees
          •      . . . . . . C.5.c.3 Acres planted in riparian .0

7004303    


  • Worksite Identifier: 7004303
  • Start Date:
  • End Date:
Area Description
San Luis Obispo Creek - riparian fencing

Location Information

  • Basin: Central California Coastal (180600)
  • Subbasin:
  • Watershed: Morro Creek-Frontal Pacific Ocean
  • Subwatershed:
  • State: California
  • Recovery Domain: S. California - S. Central CA Coast
  • Latitude: 35.29772
  • Longitude: -120.625602

ESU

  • South-Central California Coast Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 44,706.00
    •      . . C.0.b Length of stream treated/protected .65
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      N/A
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.5 Riparian Habitat ProjectY (Y/N)
      •      . . . . C.5.a Riparian Habitat Funding 44,706.22
      •      . . . . C.5.b.1 Total riparian miles streambank treated .07
      •      . . . . C.5.b.2 Total Riparian Acres Treated .0
      •      . . . . C.5.c.1 Riparian plantingY (Y/N)
        •      . . . . . . C.5.c.2
          Species of plants planted in riparian
          native trees
        •      . . . . . . C.5.c.3 Acres planted in riparian .0
      •      . . . . C.5.d.1 FencingY (Y/N)
        •      . . . . . . C.5.d.2 Miles of fence along stream .65