Habitat and Fish Management Biologists - Willamette - Technical Assist

Salmonid Habitat Restoration and Acquisition

Fish Passage Improvement Instream Habitat Riparian Habitat
Project IDODFW004i
Recovery DomainsWillamette River
Start Date07/01/2003
End Date06/30/2005
Year2002
StatusCompleted
Last Edited05/08/2024
 
1 - 1

Description    


An ODFW Habitat Biologist provided technical assistance and oversight to complete habitat restoration work conducted in the Willamette region. The biologist also served as lead worker to field crews. Technical assistance was provided to State/Federal agencies, local governments, watershed councils, and landowners on protection, enhancement and restoration of fish and wildlife habitats.

Project Benefit    


This project assisted landowners in implementing projects that minimize, mitigate or eliminate negative impacts to fish and wildlife habitat.

Accomplishments

Metric Completed Originally
Proposed
Riparian Habitat
  Stream Miles Treated .10 .10
  Acres Treated .7 .7

Funding Details

SourceFunds
PCSRF$145,369
Report Total:$145,369


Project Map



Worksites

171    


  • Worksite Identifier: 171
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Willamette (170900)
  • Subbasin: South Santiam
  • Watershed:
  • Subwatershed:
  • State: Oregon
  • Recovery Domain: Willamette River
  • Latitude: 44.6098467352938
  • Longitude: -122.707263840419

ESU

  • Upper Willamette River Steelhead DPS
  • Upper Willamette River Chinook Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding .00
    •      . . C.0.b Length of stream treated/protected .63
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Oregon Plan for Salmon and Watersheds
    •      . . C.0.d.3
      Monitoring text (from Phase I)
      Wastewater treatment facility improvements. Effluent will be monitored.
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.b.3 Type of blockage/barrier (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.b Total length of instream habitat treated .00
      •      . . . . C.4.e.1 Streambank stabilization Y (Y/N)
        •      . . . . . . C.4.e.3 Miles of streambank stabilized .00
      •      . . C.5 Riparian Habitat ProjectY (Y/N)
        •      . . . . C.5.b.1 Total riparian miles streambank treated .10
        •      . . . . C.5.b.2 Total Riparian Acres Treated .7
        •      . . . . C.5.c.1 Riparian plantingY (Y/N)
        •      . . . . C.5.h.1 Riparian plant removal/controlY (Y/N)
          •      . . . . . . C.5.h.3 Acres of riparian treated for plant removal/control
        •      . . C.11 Site maintenance projectY (Y/N)
          •      . . . . C.11.b.1 Stream or streambank maintainedY (Y/N)