Sedimentation Risk Reduction
Salmonid Habitat Restoration and Acquisition
|
Coquille-02 | Oregon Coast | 07/01/2002 | 12/31/2002 | 2001 | Completed | 05/08/2024 | |
| |
Description
Road improvement. Replace 7 culverts and clean 114 culverts on 11.5 miles of road. Installed 8 armored rolling dips. Reconstructed and stablized two road bank failures. Brushed road prism on 11.5 miles of road. Decommisson 0.5 mile of road. Mulched and seeded disturbance areas on all work sites.
Project Benefit
Reduction of sedimentation to spawning habitat for Oregon coastal coho salmon.
Accomplishments
Upland Habitat |
Acres Treated |
13.4 |
|
Funding Details |
PCSRF | $71,250 |
Report Total: | $71,250 |
|
| |
Worksites
176
- Worksite Identifier: 176
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Southern Oregon Coastal (171003)
- Subbasin: Coquille
- Watershed: Middle Fork Coquille
- Subwatershed:
- State: Oregon
- Recovery Domain: Oregon Coast
- Latitude: 42.9672369542074
- Longitude: -123.996773879971
ESU
- Oregon Coast Chinook Salmon ESU
- Oregon Coast Coho Salmon ESU
- Pacific Coast Chum Salmon ESU
- Oregon Coast Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 71,250.00
- . . C.0.b
Length of stream treated/protected .00
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Oregon Plan |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.0.d.3
Monitoring text (from Phase I) | |
Implementation and Effectiveness Monitoring. Compliance with project specifications, satisfactory fuctioning of drainage structures and reduction of sediment delivery to stream channels. |
- . . C.6
Upland Habitat And Sediment ProjectY (Y/N)
- . . . . C.6.a
Upland Habitat / Sediment Funding 71,250.00
- . . . . C.6.b.1
Acres of upland habitat area treated 13.4
- . . . . C.6.b.2
Miles of road treated in upland area 12.00
- . . . . C.6.c.1
Road drainage system improvements and reconstructionY (Y/N)
- . . . . . . C.6.c.2
Miles of road treated for drainage system improvements and reconstruction 11.50
- . . . . C.6.d.1
Road closure / abandonmentY (Y/N)
- . . . . . . C.6.d.2
Miles of road closed / abandoned .50
|
|