Sedimentation Risk Reduction

Salmonid Habitat Restoration and Acquisition

Upland Habitat And Sediment
Project IDCoquille-02
Recovery DomainsOregon Coast
Start Date07/01/2002
End Date12/31/2002
Year2001
StatusCompleted
Last Edited01/26/2024
 
1 - 1

Description    


Road improvement. Replace 7 culverts and clean 114 culverts on 11.5 miles of road. Installed 8 armored rolling dips. Reconstructed and stablized two road bank failures. Brushed road prism on 11.5 miles of road. Decommisson 0.5 mile of road. Mulched and seeded disturbance areas on all work sites.

Project Benefit    


Reduction of sedimentation to spawning habitat for Oregon coastal coho salmon.

Accomplishments

Metric Completed Originally
Proposed
Upland Habitat
  Acres Treated 13.4

Funding Details

SourceFunds
PCSRF$71,250
Report Total:$71,250


Project Map



Worksites

176    


  • Worksite Identifier: 176
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Southern Oregon Coastal (171003)
  • Subbasin: Coquille
  • Watershed: Middle Fork Coquille
  • Subwatershed:
  • State: Oregon
  • Recovery Domain: Oregon Coast
  • Latitude: 42.9672369542074
  • Longitude: -123.996773879971

ESU

  • Oregon Coast Chinook Salmon ESU
  • Oregon Coast Coho Salmon ESU
  • Pacific Coast Chum Salmon ESU
  • Oregon Coast Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 71,250.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Oregon Plan
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.0.d.3
      Monitoring text (from Phase I)
      Implementation and Effectiveness Monitoring. Compliance with project specifications, satisfactory fuctioning of drainage structures and reduction of sediment delivery to stream channels.
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 71,250.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated 13.4
      •      . . . . C.6.b.2 Miles of road treated in upland area 12.00
      •      . . . . C.6.c.1 Road drainage system improvements and reconstructionY (Y/N)
        •      . . . . . . C.6.c.2 Miles of road treated for drainage system improvements and reconstruction 11.50
      •      . . . . C.6.d.1 Road closure / abandonmentY (Y/N)
        •      . . . . . . C.6.d.2 Miles of road closed / abandoned .50