Coordination of Production Issues and Regional Processes
Salmonid Restoration Planning and Assessments
|
2002-5-03 | Lower Columbia River | 06/01/2002 | 12/31/2004 | 2002 | Completed | 05/08/2024 | |
| |
Description
This project is complete. Reported accomplishments include (a) The development of artificial propogation guidelines for use in tribal programs; (b) A review of the current literature on the genetic and environmental effects of the various types of artificial production on natural stocks, which built on the foundation established by Whiteaker and Talbot (2002) in their Review of the literature on the ESU concept and Artificial Propagation of Endangered Species by including subsequent publications from scientific journals that clarified our understanding of the known and empirically tested effects of artificial production; (c) Coordination with federal processes. Several draft documents on the technical elements of a sound artificial production policy were prepared at the request of NOAA Fisheries.
Project Benefit
An opportunity to determine how hatchery-reared or hatchery-bred fish are to count toward restoration for the purpose of recovery of listed populations.
Funding Details |
PCSRF | $66,127 |
Report Total: | $66,127 |
|
| |
Worksites
1
- Worksite Identifier: 1
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Willamette (170900)
- Subbasin: Lower Willamette
- Watershed: 1709001203
- Subwatershed:
- State: Oregon
- Recovery Domain: Lower Columbia River
- Latitude: 45.54
- Longitude: -122.615
ESU
- Mid-Columbia River Spring-run Chinook Salmon ESU
- Lower Columbia River Coho Salmon ESU
- Columbia River Chum Salmon ESU
- Lower Columbia River Steelhead DPS
- Middle Columbia River Steelhead DPS
- Un-Named ESU Coho
- Lower Columbia River Chinook Salmon ESU
Map
Photos
Metrics
Metrics
- B.0
Salmonid Restoration Planning and AssessmentsY (Y/N)
- . . B.0.a
Planning And Assessment Funding 66,127.00
- . . B.0.b.1
Area Encompassed .0
- . . B.1
Restoration Planning And CoordinationY (Y/N)
- . . . . B.1.a
Planning and Coordination funding 66,127.00
- . . . . B.1.b.7
Developing monitoring plans or sampling protocolsY (Y/N)
- . . . . . . B.1.b.7.a
Name of plan developed | |
CRITFC, Artificial Propogation Guidelines for Treaty Tribes, Portland, 2004 |
- . . . . . . B.1.b.7.b
Description and scope of the plan developed | |
Artificial Propagation Guidelines to assist the four treaty tribes in their restoration efforts. |
|
|