Makah U&A Salmon Habitat Restoration

Salmonid Habitat Restoration and Acquisition

Fish Passage Improvement Instream Habitat Riparian Habitat Wetland
Project ID100003
Recovery DomainsOzette Lake
Start Date07/01/2002
End Date09/30/2003
Year2002
StatusCompleted
Last Edited01/31/2024
 
1 - 1

Description    


Project consists of planned and opportunistic supplementation of salmon recovery efforts in the Makah U&A through instream habitat improvements, riparian restoration, barrier removal and habitat assessment.

Project Benefit    


Contribute to recovery of aquatic ecosystems within the Makah U&A and increase public awareness and involvement in salmon recovery.

Accomplishments

Metric Completed Originally
Proposed
Instream Habitat
  Stream Miles Treated 2.84 2.84
Riparian Habitat
  Stream Miles Treated .94
  Acres Treated .9
Fish Passage
  Barriers Removed
  Miles Opened 3.00 .00

Funding Details

SourceFunds
PCSRF$27,955
Report Total:$27,955


Project Map



Worksites

1000005    


  • Worksite Identifier: 1000005
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Washington Coastal (171001)
  • Subbasin: Queets-Quinalt
  • Watershed:
  • Subwatershed:
  • State: Washington
  • Recovery Domain:
  • Latitude: 47.6748235770615
  • Longitude: -124.158942751808

ESU

  • Washington Coast Chinook Salmon ESU
  • Olympic Peninsula Coho Salmon ESU
  • Pacific Coast Chum Salmon ESU
  • Olympic Peninsula Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 6,989.00
    •      . . C.0.b Length of stream treated/protected 2.84
    •      . . C.0.d.3
      Monitoring text (from Phase I)
      Brownes Creek: monitor pre-treatment conditions and post-treatment response of geomorphic and habitat conditions, which included 16 cross-sections, a 10,000-foot longitudinal profile survey, surface bed material size sampling, photo points, and habitat template surveys.
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 6,989.00
      •      . . . . C.4.b Total length of instream habitat treated 2.84
      •      . . . . C.4.e.1 Streambank stabilization Y (Y/N)

20023366    


  • Worksite Identifier: 20023366
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Washington Coastal (171001)
  • Subbasin: Hoh-Quillayute
  • Watershed:
  • Subwatershed:
  • State: Washington
  • Recovery Domain:
  • Latitude: 48.345430146454
  • Longitude: -124.678747651184

ESU

  • Washington Coast Chinook Salmon ESU
  • Olympic Peninsula Coho Salmon ESU
  • Pacific Coast Chum Salmon ESU
  • Olympic Peninsula Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 6,988.00
    •      . . C.0.b Length of stream treated/protected .94
    •      . . C.0.d.3
      Monitoring text (from Phase I)
      Waatch Creek: Monitoring includes 28 cross-sections, a 5000 foot longitudinal profile survey, a stream gage, a continuous turbidity meter, suspended sediment sampling, benthic invertebrate sampling, surface bed material size sampling, subsurface fine sediment sampling, photo points, and control surveys on a nearby stream.
    •      . . C.5 Riparian Habitat ProjectY (Y/N)
      •      . . . . C.5.a Riparian Habitat Funding 6,988.00
      •      . . . . C.5.b.1 Total riparian miles streambank treated .94
      •      . . . . C.5.b.2 Total Riparian Acres Treated .9
      •      . . . . C.5.h.1 Riparian plant removal/controlY (Y/N)
        •      . . . . . . C.5.h.3 Acres of riparian treated for plant removal/control .0

20023371    


  • Worksite Identifier: 20023371
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Washington Coastal (171001)
  • Subbasin: Hoh-Quillayute
  • Watershed:
  • Subwatershed:
  • State: Washington
  • Recovery Domain: Ozette Lake
  • Latitude: 48.1798164800459
  • Longitude: -124.705308728905

ESU

  • Washington Coast Chinook Salmon ESU
  • Olympic Peninsula Coho Salmon ESU
  • Pacific Coast Chum Salmon ESU
  • Olympic Peninsula Steelhead DPS
  • Ozette Lake Sockeye Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 6,989.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.d.3
      Monitoring text (from Phase I)
      Project entailed biological monitoring of Lake Ozette Tributary conditions.
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 6,989.00
      •      . . . . C.4.b Total length of instream habitat treated .00
      •      . . . . C.4.e.1 Streambank stabilization Y (Y/N)
        •      . . . . . . C.4.e.3 Miles of streambank stabilized .00

20025496    


  • Worksite Identifier: 20025496
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Washington Coastal (171001)
  • Subbasin: Hoh-Quillayute
  • Watershed:
  • Subwatershed:
  • State: Washington
  • Recovery Domain:
  • Latitude: 48.3206477085883
  • Longitude: -124.659444128153

ESU

  • Washington Coast Chinook Salmon ESU
  • Olympic Peninsula Coho Salmon ESU
  • Pacific Coast Chum Salmon ESU
  • Olympic Peninsula Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 6,989.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.d.3
      Monitoring text (from Phase I)
      Monitored to assess the success of culvert removals.
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.a Fish Passage Funding 4,989.00
      •      . . . . C.2.b.1 Length of stream made accessible 3.00
      •      . . . . C.2.b.4 Number of blockages/impediments/barriers impeding passage 8
      •      . . . . C.2.f.1 Culvert installed or improved at road stream crossingY (Y/N)
        •      . . . . . . C.2.f.3 Miles of stream made accessible by culvert installation/upgrade 3.00
      •      . . C.8 Wetland ProjectY (Y/N)
        •      . . . . C.8.a Wetland funding 2,000.00
        •      . . . . C.8.b Total acres of wetland area treated .0
        •      . . . . C.8.d.1 Wetland plant removal/controlY (Y/N)
          •      . . . . . . C.8.d.3 Acres of wetland treated .0
        •      . . . . C.8.f.1 Artificial wetland createdY (Y/N)
          •      . . . . . . C.8.f.2 Artificial wetland acres created .0