Kabusie Creek Habitat Restoration

Salmonid Habitat Restoration and Acquisition

Fish Passage Improvement
Project ID10-MAKA-03
Recovery Domains -
Start Date01/01/2012
End Date12/31/2014
Year2010
StatusTerminated
Last Edited05/01/2025
 
1 - 1

Description    


This projects timeline has extended beyond the sunset date of this fiscal year award, which necessitated that the Tribe submit a budget modification. The final amount dedicated to this project was substantially less than initially conceived. Funding furthered the project by supporting planning and coordination activities that are slated to result in the bridge installation in the summer 2015. PCSR FY 2011 & 2012 funding will provide contributions to the installation of the bridge structure. PCSRF reporting metrics will be captured in these subsequent years.

Project Benefit    


Sooes River limiting factors addressed are loss of tributary spawning habitat due to fish blocking structures and loss of tributary contributions to summer base flows in the Sooes River.

Accomplishments

Metric Completed Originally
Proposed
Fish Passage
  Barriers Removed
  Miles Opened .00 2.00

Funding Details

SourceFunds
PCSRF$4,067
Report Total:$4,067


Project Map



Worksites

20119713    


  • Worksite Identifier: 20119713
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Washington Coastal (171001)
  • Subbasin: Hoh-Quillayute (17100101)
  • Watershed:
  • Subwatershed:
  • State: Washington
  • Recovery Domain:
  • Latitude: 48.304122
  • Longitude: -124.650587

ESU

  • Washington Coast Chinook Salmon ESU
  • Olympic Peninsula Coho Salmon ESU
  • Pacific Coast Chum Salmon ESU
  • Olympic Peninsula Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 4,067.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      None
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.0.d.3
      Monitoring text (from Phase I)
      None
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.a Fish Passage Funding 4,067.00
      •      . . . . C.2.b.1 Length of stream made accessible .00
      •      . . . . C.2.b.3 Type of blockage/barrier (LOV)
      •      . . . . C.2.b.4 Number of blockages/impediments/barriers impeding passage 0
      •      . . . . C.2.g.1 Bridge installed or improved at road stream crossingY (Y/N)
        •      . . . . . . C.2.g.2 Number of bridges installed or improved/upgraded 0
        •      . . . . . . C.2.g.3 Miles of stream made accessible by bridge installation or improvement/upgrade .00