Quinault Fixed Hydroacoustics Feasibility
Salmonid Research, Monitoring, and Evaluation (RM&E)
|
2009-2 | - | 03/01/2010 | 08/31/2010 | 2009 | Completed | 05/01/2025 | |
| |
Description
QDFi contracted with Biosonics, Inc. to produce the feasibility and design information necessary to effectively deploy an acoustic sampling system in the Quinault River downriver from Lake Quinault and just upriver from the commercial fishing zone. The following tasks were completed: 1. Evaluation of potential sites for deployment of a fixed-position hydroacoustic system. 2. Deployment of temporary fixed-position hydroacoustic arrays for field testing at each candidate site. 3. A detailed report of the findings at each candidate site that explains the technical and practical advantages and disadvantages of each site, recommendations regarding final site selection as well as an opinion as to overall feasibility of the project.
Project Benefit
A fixed-position hydroacoustic system will provide QDFi with real-time estimates of sockeye salmon escapement, improve inseason fisheries management and facilitate achievement of QINs sockeye restoration objectives. This project will provide feasibility and design information necessary to assure informed site selection for the hydroacoustic system and ensure wise use of limited funding to deploy the system and begin modifying current fisheries management procedures.
Funding Details |
PCSRF | $31,194 |
Report Total: | $31,194 |
|
| |
Worksites
20117758
- Worksite Identifier: 20117758
- Start Date: 03/01/2010
- End Date: 09/30/2010
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Washington Coastal (171001)
- Subbasin: Queets-Quinault (17100102)
- Watershed:
- Subwatershed:
- State: Washington
- Recovery Domain:
- Latitude: 47.344697
- Longitude: -124.279075
ESU
- Quinault Lake Sockeye Salmon ESU
Map
Photos
Metrics
Metrics
- E.0
Salmonid Research, Monitoring, and Evaluation (RM&E)Y (Y/N)
- . . E.0.a
RM&E Funding 31,194.00
- . . E.0.b
Complement habitat restoration project | |
Upper Quinault Salmon Habitat Restoration Plan |
- . . E.0.c
Project identified in a plan or watershed assessment. | |
none |
- . . E.0.d.1
Number of Cooperating Organizations 0
- . . E.0.d.2
Name Of Cooperating Organizations. | |
none |
- . . E.0.e.1
Number of reports prepared 1
- . . E.0.e.2
Name Of Report | |
Biosonics, Inc.; 8/19/10; Evaluation of Quinault River Candidate Sites for Installation of an Automated Fish Counting System; 4027 Leary Way NW, Seattle WA 98107 |
- . . E.1
MonitoringY (Y/N)
- . . . . E.1.a
Monitoring funding 31,194.00
- . . . . E.1.b.1
Stream Miles Monitored .00
- . . . . E.1.b.2
Acres of Watershed Area Monitored .0
- . . . . E.1.b.3
Square miles of water monitored0 (Square miles)
- . . . . E.1.c.1
Adult salmonid population monitoringY (Y/N)
- . . . . . . E.1.c.1.a
# miles (to nearest 0.01 mile) monitored for adult salmonids .00
- . . . . E.1.c.2
Salmonid smolt or fry monitoringY (Y/N)
- . . . . . . E.1.c.2.a
# miles (to nearest 0.01 mile) monitored for Salmonid smolt or fry .00
- . . . . E.1.d
Name Of Comprehensive Monitoring Strategy/Program | |
none |
- . . . . E.1.e
Description of monitoring | |
Developing a non-intrusive (i.e. non-harvest/no mortality) method such as a fixed-position hydroacoustic system for measuring run strength as fish enter the Quinault River will provide real-time estimates of sockeye salmon escapement, improve in-season management, and facilitate achievement of QIN's sockeye restoration objectives. |
|
|