Mill Creek Restoration Enhancement
Salmonid Habitat Restoration and Acquisition
|
2007-1 | N Central California Coast | 06/01/2007 | 09/30/2008 | 2007 | Completed | 01/14/2025 | |
| |
Description
The various stream restoration and enhancement activities described in the proposal were met and even exceeded with the development/enhancement of 5 boulder scour pools and the installation of 9 boulder weirs to direct channel flow tot he center of the channel thus increasing back stability and placing additional rip rap in several corners extending their length and further directing stream flow tot he next corner and reduce scour action along the banks, improving nearly 1/4 mile of stream bank stability and fish habitat.
Project Benefit
Improvement of existing instream and bank stabilization projects and conditions as well as the protection of past investments within the stream restoration project area.
Funding Details |
PCSRF | $34,000 |
Report Total: | $34,000 |
|
| |
Worksites
20093583
- Worksite Identifier: 20093583
- Start Date: 06/01/2007
- End Date: 12/31/2007
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Northern California Coastal (180101)
- Subbasin: Middle Fork Eel (18010104)
- Watershed: Mill Creek
- Subwatershed:
- State: California
- Recovery Domain: N Central California Coast
- Latitude: 39.788333
- Longitude: -123.210278
ESU
- California Coastal Chinook Salmon ESU
- Central California Coast Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 34,000.00
- . . C.0.b
Length of stream treated/protected 2.40
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
1998 Instream Monitoring Inventory and Assessment of Anadromous Habitats - Final Report |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.0.d.3
Monitoring text (from Phase I) | |
Same as above |
- . . C.11
Site maintenance projectY (Y/N)
- . . . . C.11.a
Site maintenance funding 34,000.00
- . . . . C.11.b.1
Stream or streambank maintainedY (Y/N)
- . . . . . . C.11.b.2
Miles of streambank maintained 2.30
|
|