Salmon Habitat Restoration
Salmonid Habitat Restoration and Acquisition
|
2004-Makah-5 | Ozette Lake | 06/15/2006 | 11/20/2006 | 2004 | Completed | 05/01/2025 | |
| |
Description
Big River LWD: A second stream channel reach of this project was completed in summer 2006 along 800 feet of an eroding pasture bank of Big River upstream from last years LWD project. FY 04 PCSR funds were utilized to mobilize the wood and construct the jams.
Project Benefit
Contribution of recovery of aquatic ecosystems within the Makah U&A by conducting restoration projects or supplementing larger restoration projects opportunistically.
Accomplishments
Instream Habitat |
Stream Miles Treated |
.25 |
.25 |
Riparian Habitat |
Stream Miles Treated |
.25 |
.25 |
Acres Treated |
.3 |
.3 |
Fish Passage |
Barriers Removed |
|
|
Miles Opened |
3.00 |
3.00 |
Funding Details |
PCSRF | $121,908 |
Report Total: | $121,908 |
|
| |
Worksites
20025428
- Worksite Identifier: 20025428
- Start Date:
- End Date:
Area Description
Sooes River Projects
Location Information
- Basin: Washington Coastal (171001)
- Subbasin: Hoh-Quillayute (17100101)
- Watershed:
- Subwatershed:
- State: Washington
- Recovery Domain:
- Latitude: 48.3206529054
- Longitude: -124.6594370874
ESU
- Washington Coast Chinook Salmon ESU
- Olympic Peninsula Coho Salmon ESU
- Pacific Coast Chum Salmon ESU
- Olympic Peninsula Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding .00
- . . C.0.b
Length of stream treated/protected 5.00
- . . C.0.d.3
Monitoring text (from Phase I) | |
Monitoring of pre- and post-project instream and riparian habitat conditions will be conducted on an as needed basis and details will depend on project specifics. In general, monitoring may include one or more of the following: measurements of LWD and jam density; pool conditions; habitat unit area and frequency; canopy density and riparian condition; permanent reference/photo points; permanent cross-sections; channel profile surveys; substrate size distribution data; fish presence/absence surveys; redd count surveys; discharge and velocity measurements; water quality; and biological health. |
- . . C.2
Fish Passage ImprovementY (Y/N)
- . . . . C.2.b.1
Length of stream made accessible 3.00
- . . . . C.2.b.4
Number of blockages/impediments/barriers impeding passage 12
- . . . . C.2.f.1
Culvert installed or improved at road stream crossingY (Y/N)
- . . . . . . C.2.f.3
Miles of stream made accessible by culvert installation/upgrade 3.00
20025433
- Worksite Identifier: 20025433
- Start Date:
- End Date:
Area Description
Big River LWD
Location Information
- Basin: Washington Coastal (171001)
- Subbasin: Hoh-Quillayute (17100101)
- Watershed:
- Subwatershed:
- State: Washington
- Recovery Domain: Ozette Lake
- Latitude: 48.17981648
- Longitude: -124.7053087289
ESU
- Ozette Lake Sockeye Salmon ESU
- Washington Coast Chinook Salmon ESU
- Olympic Peninsula Coho Salmon ESU
- Pacific Coast Chum Salmon ESU
- Olympic Peninsula Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding .00
- . . C.0.b
Length of stream treated/protected .50
- . . C.0.d.3
Monitoring text (from Phase I) | |
Monitoring of pre- and post-project instream and riparian habitat conditions will be conducted on an as needed basis and details will depend on project specifics. In general, monitoring may include one or more of the following: measurements of LWD and jam density; pool conditions; habitat unit area and frequency; canopy density and riparian condition; permanent reference/photo points; permanent cross-sections; channel profile surveys; substrate size distribution data; fish presence/absence surveys; redd count surveys; discharge and velocity measurements; water quality; and biological health. |
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.b
Total length of instream habitat treated .25
- . . . . C.4.e.1
Streambank stabilization Y (Y/N)
- . . . . . . C.4.e.3
Miles of streambank stabilized
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.b.1
Total riparian miles streambank treated .25
- . . . . C.5.b.2
Total Riparian Acres Treated .3
- . . . . C.5.h.1
Riparian plant removal/controlY (Y/N)
- . . . . . . C.5.h.3
Acres of riparian treated for plant removal/control .0
|
|