Huckleberry Creek Coho Refugia Project

Salmonid Habitat Restoration and Acquisition

Instream Habitat
Project ID1737561847731
Recovery DomainsN Central California Coast
Start Date03/19/2025
End Date02/28/2028
Year2024
StatusOngoing
Last Edited05/01/2025
 
1 - 1

Description    


This project will add 32 structures containing 95 pieces of large wood (LW) to Huckleberry Creek. Large wood structures will be installed along a 1.2-mile reach of Huckleberry Creek and will be composed of redwood and Douglas fir logs, whole trees, and logs with root wads, anchored to live trees along the stream banks. This project will provide habitat to coho salmon and steelhead, which have been documented in the project reach. Additionally, 200 redwoods and 50 native shrubs will be planted in the riparian zone along the project reach.

Project Benefit    


The project will directly benefit salmonids by increasing pool area and depth, increasing shelter complexity, sorting substrate for spawning habitat, increasing the frequency of side channel and flood plain inundation, capturing large and small wood, and providing velocity refugia during high flows.

Accomplishments

Metric Completed Originally
Proposed
Instream Habitat
  Stream Miles Treated 1.20

Funding Details

SourceFunds
PCSRF$194,030
In-Kind Donated Labor$26,936
In-Kind Other$47,500
Report Total:$268,466


Project Map



Worksites

1737561848293    


  • Worksite Identifier: 1737561848293
  • Start Date:
  • End Date:
Area Description
Huckleberry Creek Project Reach

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 39.73351
  • Longitude: -123.72368

ESU

  • Southern Oregon/Northern California Coast Coho Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding .00
    •      . . C.0.b Length of stream treated/protected
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding
      •      . . . . C.4.b Total length of instream habitat treated
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement
        •      . . . . . . C.4.d.4 Acres of streambed treated through channel structure placement
        •      . . . . . . C.4.d.6 Yards of average stream-width at mid-point of channel structure placement project (Yards)
        •      . . . . . . C.4.d.7 Number of structures placed in channel