Holcomb Creek Large Wood Enhancement #1
Salmonid Habitat Restoration and Acquisition
|
OWEB 222-8207-19657 | Willamette River | 08/01/2021 | 12/31/2024 | 2020 | Ongoing | 04/29/2025 | |
| |
Description
The project location is on Holcomb Creek 0.2 miles upstream from its confluence with Abernethy Creek. Stream inventories conducted in 2017 and 2019 indicated a lack or large wood and associated complex habitat throughout the Abernethy Creek watershed, including Holcomb Creek. The low level of large wood in the system is the result of past timber practices that reduced the level of conifer trees in riparian areas as well as potential direct removal of wood from the system. Restoration activities for this project include placing large wood, invasive species removal, and native species planting. The project will also use logs to exclude cattle in place of fencing due to risk of fence damage from flowing waters. Project Partners include members of the Clackamas Partnership and the Clackamas Soil & Water Conservation District.
Project Benefit
Lower Columbia River coho and winter steelhead are negatively impacted by loss of habitat, impaired water quality and lack of access to historic spawning areas. This project will restore habitat elements believed to be most limiting to salmon and steelhead as identified in local and regional assessments referenced above and below in this application.
The 2017 stream habitat inventory (Cascade Environmental Group) found there are relatively low quantities of instream large wood pieces, particularly large logs (key large wood pieces). Replacing large wood along Holcomb Creek will provide salmon and steelhead complex overhanging cover and recruit gravels for improved substrate complexity. Upland downed wood is also important for amphibians and other terrestrial species that require escape cover and areas for hibernation. Significantly increasing the density of large wood on the site would greatly enhance biological conditions for fish and wildlife.
Lack of riparian vegetation: Removal of invasive plants and reestablishment of native trees and shrubs will increase instream shading, replenish the large wood cycle, and reestablish more naturally moderated channel migration rates. Each of these will benefit salmon and steelhead by improving the quality and future sustainability of available habitat.
Accomplishments
Instream Habitat |
Stream Miles Treated |
|
.14 |
Riparian Habitat |
Stream Miles Treated |
|
.28 |
Acres Treated |
|
.9 |
Funding Details |
PCSRF | $68,609 |
Other | $7,000 |
In-Kind Donated Labor | $1,500 |
In-Kind Other | $30,200 |
Report Total: | $107,309 |
|
| |
Worksites
19657
- Worksite Identifier: 19657
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Willamette (170900)
- Subbasin: Middle Willamette (17090007)
- Watershed:
- Subwatershed:
- State: Oregon
- Recovery Domain: Willamette River
- Latitude: 45.355481
- Longitude: -122.56053
ESU
- Lower Columbia River Steelhead DPS
- Lower Columbia River Coho Salmon ESU
- Lower Columbia River Chinook Salmon ESU
- Columbia River Chum Salmon ESU
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding
- . . C.0.b
Length of stream treated/protected
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
|
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding
- . . . . C.4.b
Total length of instream habitat treated
- . . . . C.4.d.1
Channel structure placementY (Y/N)
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding
- . . . . C.5.b.1
Total riparian miles streambank treated
- . . . . C.5.b.2
Total Riparian Acres Treated
- . . . . C.5.c.1
Riparian plantingY (Y/N)
- . . . . C.5.e.1
Riparian exclusionY (Y/N)
- . . . . C.5.h.1
Riparian plant removal/controlY (Y/N)
|
|