Middle Crabtree Creek Restoration - Phase 2 - PE
Salmonid Habitat Restoration and Acquisition
|
OWEB 216-3003-12510 | - | 10/27/2015 | 11/04/2024 | 2014 | Completed | 04/30/2025 | |
| |
Description
The activities funded by this grant included plant establishment activities and assess plant growth and survival at two locations long Crabtree Creek. Additionally, this grant funded noxious weed management, monitoring for project components and interplanting where plant success was reduced for various reasons. This project built on other nearby work in the basin, bringing much needed shading and plant species diversity to the creekside. Over time, these plantings will also provide a primary source of food and habitat for both terrestrial and aquatic species, creating the foundation of a robust food web.
Project Benefit
This project will maintain native tree and shrub plantings on 32 riparian acres in the Crabtree Creek watershed, an important basin offering spawning and rearing habitat for ESA-listed spring Chinook and winter steelhead. In the short term, native trees and shrubs will help filter pollutants, slow fine sediment contributions to the water, and offer floodplain complexity. As the plantings mature, the short term benefits will continue, as well as additional benefits will accrue from stream shading and leaf litter/wood contributions into Crabtree Creek.
Funding Details |
State | $118,765 |
Other | $16,500 |
Report Total: | $135,265 |
|
| |
Worksites
12510
- Worksite Identifier: 12510
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 44.646805
- Longitude: -122.75643262
ESU
- Upper Willamette River Steelhead DPS
- Upper Willamette River Chinook Salmon ESU
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 135,265.00
- . . C.0.b
Length of stream treated/protected .85
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Willamette River Basin Restoration Priorities (OWEB, 2005)
ESA Recovery Plan-Upper Willamette River Chinook and Steelhead (ODFW, 2011)
Wilamette Sub-Basin Plan (NWPCC, 2004)
Biological Opinion (USACE, 2008) |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.11
Site maintenance projectY (Y/N)
- . . . . C.11.a
Site maintenance funding 135,265.00
- . . . . C.11.b.1
Stream or streambank maintainedY (Y/N)
- . . . . . . C.11.b.2
Miles of streambank maintained .85
|
|