Upper Molalla River Rapid Bio-Assessment

Salmonid Restoration Planning and Assessments

Salmonid Habitat Assessment / Inventory
Project IDOWEB 211-3056-8604
Recovery DomainsWillamette River
Start Date07/01/2011
End Date12/19/2012
Year2010
StatusCompleted
Last Edited04/28/2025
 
1 - 1

Description    


This project implemented Year 1 of the Molalla Watershed Rapid (RBA) and covered the Upper Molalla River Watershed. This first phase of the RBA quantified the abundance and distribution of ESA-listed spring Chinook and coho salmon, winter and summer steelhead, and rainbow and cutthroat trout in 93.1 miles of tributaries and the mainstem Molalla River.

Project Benefit    


The upcoming Upper Willamette River Recovery Plan calls for numerous implementation actions to recover Molalla River spring chinook salmon and winter steelhead, including a reintroduction of wild spring chinook to the basin using hatchery stock. It is vital that Molallas fish populations are documented before the plan is implemented to determine an accurate baseline in order to meet the goals outlines in the plan and to identify where restoration activities will be most successful.

Accomplishments

Metric Completed Originally
Proposed
Planning and Assessment
  Stream Miles Assessed 93.10 100.00

Funding Details

SourceFunds
PCSRF$26,100
Other$10,000
In-Kind Volunteers$500
In-Kind Donated Labor$2,925
In-Kind Other$87
Report Total:$39,612


Project Map



Worksites

8604    


  • Worksite Identifier: 8604
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Willamette (170900)
  • Subbasin: Molalla-Pudding (17090009)
  • Watershed:
  • Subwatershed:
  • State: Oregon
  • Recovery Domain: Willamette River
  • Latitude: 45.00644447
  • Longitude: -122.37389834

ESU

  • Upper Willamette River Steelhead DPS
  • Upper Willamette River Chinook Salmon ESU

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding 39,611.96
    •      . . B.0.b.1 Area Encompassed 1,128.0
    •      . . B.0.b.2 Stream Miles Affected 93.10
    •      . . B.2 Salmonid Habitat Assessment / InventoryY (Y/N)
      •      . . . . B.2.a Habitat Assessment Funding 39,611.96
      •      . . . . B.2.c Instream SurveyY (Y/N)
        •      . . . . . . B.2.c.1 Type of instream survey (LOV)
        •      . . . . . . B.2.c.2 Stream miles assessed 93.10
        •      . . . . . . B.2.c.3 Stream miles assessed that contained salmonids 93.10
        •      . . . . . . B.2.c.4 Stream miles assessed that needed restoration .00
        •      . . . . . . B.2.c.5 Stream miles assessed for regulatory actions .00
        •      . . . . . . B.2.c.6 Fish passage impediments identified 2