Twisp Floodplain Left Bank Alcove Restoration
Salmonid Habitat Restoration and Acquisition
|
18-1857 R | Upper Columbia River | 12/05/2018 | 09/22/2020 | 2018 | Completed | 05/01/2025 | |
| |
Description
The project enhanced water quality in a unique spring-fed alcove by the replacement of one undersized road culvert with a bridge, re-construction of a more natural channel meander and enhancement of the channel confluence with the Twisp River. The bridge allows improved fish passage through the channel and into the alcove, thus benefitting ESA-listed spring Chinook and steelhead trout. Site restoration included revegetation with native trees and shrubs.
Project Benefit
To provide expanded access to off-channel rearing habitat along the Twisp river, benefitting ESA-listed spring Chinook and steelhead.
Accomplishments
Wetland Habitat |
Acres Created |
|
|
Acres Treated |
1.6 |
1.6 |
Riparian Habitat |
Stream Miles Treated |
.03 |
.32 |
Acres Treated |
.1 |
2.5 |
Fish Passage |
Barriers Removed |
|
|
Miles Opened |
.20 |
.20 |
Funding Details |
PCSRF | $41,822 |
Other | $12,084 |
Report Total: | $53,906 |
|
| |
Worksites
1-TRFP Alcove Channel
- Worksite Identifier: 1-TRFP Alcove Channel
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Upper Columbia (170200)
- Subbasin:
- Watershed:
- Subwatershed:
- State: Washington
- Recovery Domain: Upper Columbia River
- Latitude: 48.37192069
- Longitude: -120.1917585
ESU
- Upper Columbia River Steelhead DPS
- Upper Columbia River Spring-run Chinook Salmon ESU
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 53,906.01
- . . C.0.b
Length of stream treated/protected .04
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
|
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.2
Fish Passage ImprovementY (Y/N)
- . . . . C.2.a
Fish Passage Funding 13,945.42
- . . . . C.2.b.1
Length of stream made accessible .20
- . . . . C.2.b.3
Type of blockage/barrier (LOV)
- . . . . C.2.b.4
Number of blockages/impediments/barriers impeding passage 1
- . . . . C.2.g.1
Bridge installed or improved at road stream crossingY (Y/N)
- . . . . . . C.2.g.2
Number of bridges installed or improved/upgraded 1
- . . . . . . C.2.g.3
Miles of stream made accessible by bridge installation or improvement/upgrade .20
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding 12,069.76
- . . . . C.5.b.1
Total riparian miles streambank treated .03
- . . . . C.5.b.2
Total Riparian Acres Treated .1
- . . . . C.5.d.1
FencingY (Y/N)
- . . . . . . C.5.d.2
Miles of fence along stream .00
- . . . . . . C.5.d.3
Acres of riparian area protected by fencing .0
- . . C.8
Wetland ProjectY (Y/N)
- . . . . C.8.a
Wetland funding 27,890.83
- . . . . C.8.b
Total acres of wetland area treated 1.6
- . . . . C.8.e.1
Wetland improvement/restorationY (Y/N)
- . . . . . . C.8.e.2
Acres of wetland treated 1.6
|
|