Roller, Ed Jr.- Salmon Creek R6
Salmonid Habitat Restoration and Acquisition
|
07-2013 R | Lower Columbia River | 10/01/2008 | 09/16/2010 | 2008 | Completed | 05/01/2025 | |
| |
Description
The Cowlitz Conservation District replaced a culvert that was a partial barrier. The culvert was located on designated forestland owned by Ed Roller and was a partial barrier to chum, coho, steelhead and searun cutthroat trout in Salmon Creek, a tributary to the Cowlitz River in Township 9N, Range 2 West, section 2. There is 3.31 miles (5323 meters) of habitat gain to first known total barrier - Dam site # 992221. The landowner had observed salmon at the culvert. There are no barriers downstream. The project removed the two corrugated metal pipes and replaced them with a 16 ft wide by 50 ft long prefabricated steel I-beam bridge span.
Project Benefit
The goal of the project is to connect isolated habitat to increase the range and distribution of salmon.
The objective of the project is to increase access to areas blocked by human-caused impediments.
Accomplishments
Fish Passage |
Barriers Removed |
|
|
Miles Opened |
3.31 |
3.31 |
Funding Details |
State | $73,279 |
Other | $883 |
Report Total: | $74,161 |
|
| |
Worksites
1-Roller - Salmon Cr
- Worksite Identifier: 1-Roller - Salmon Cr
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Lower Columbia (170800)
- Subbasin:
- Watershed:
- Subwatershed:
- State: Washington
- Recovery Domain: Lower Columbia River
- Latitude: 46.29476268
- Longitude: -122.88875558
ESU
- Lower Columbia River Coho Salmon ESU
- Columbia River Chum Salmon ESU
- Lower Columbia River Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 74,161.49
- . . C.0.b
Length of stream treated/protected .02
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
None |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.2
Fish Passage ImprovementY (Y/N)
- . . . . C.2.a
Fish Passage Funding 74,161.49
- . . . . C.2.b.1
Length of stream made accessible 3.31
- . . . . C.2.b.3
Type of blockage/barrier (LOV)
- . . . . C.2.b.4
Number of blockages/impediments/barriers impeding passage 1
- . . . . C.2.g.1
Bridge installed or improved at road stream crossingY (Y/N)
- . . . . . . C.2.g.2
Number of bridges installed or improved/upgraded 1
- . . . . . . C.2.g.3
Miles of stream made accessible by bridge installation or improvement/upgrade 3.31
|
|