Skinney Creek Floodplain Restoration Design
Salmonid Restoration Planning and Assessments
|
14-1732 P | Upper Columbia River | 11/25/2015 | 01/31/2018 | 2014 | Completed | 05/01/2025 | |
| |
Description
This project developed prelminary designs for the Skinney Creek stream restoration project. Railroad construction and subsequent construction of Highway 2 re-aligned Skinney Creek into its current channel configuration. The lower 2,000 feet of Skinney Creek is narrow and confined between two remnant berms or levees. This design project developed conceptual and preliminary designs to re-construct the stream channel into its former floodplain area.
Project Benefit
This project developed a prelminary design to re-align Skinney Creek back into its historic channel and adding large woody material. This project, when implemented in the future, will benefit Chinook and steelhead.
Funding Details |
PCSRF | $27,364 |
Other | $36,324 |
Report Total: | $63,688 |
|
| |
Worksites
1-Skinney Creek Floodplain
- Worksite Identifier: 1-Skinney Creek Floodplain
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Upper Columbia (170200)
- Subbasin:
- Watershed:
- Subwatershed:
- State: Washington
- Recovery Domain: Upper Columbia River
- Latitude: 47.68929463
- Longitude: -120.73672633
ESU
- Upper Columbia River Steelhead DPS
Map
Photos
Metrics
Metrics
- B.0
Salmonid Restoration Planning and AssessmentsY (Y/N)
- . . B.0.a
Planning And Assessment Funding 63,688.00
- . . B.0.b.1
Area Encompassed 10.0
- . . B.0.b.2
Stream Miles Affected .70
- . . B.1
Restoration Planning And CoordinationY (Y/N)
- . . . . B.1.a
Planning and Coordination funding 63,688.00
- . . . . B.1.b.11
Engineering/design work for restoration projectsY (Y/N)
- . . . . . . B.1.b.11.a
Name of plan implemented | |
Upper Columbia Salmon Recovery Board. 2007. Upper Columbia Spring Chinook Salmon and Steelhead Recovery Plan. https://www.westcoast.fisheries.noaa.gov/publications/recovery_planning/salmon_steelhead/domains/interior_columbia/upper_columbia/uc_plan.pdf |
- . . . . . . B.1.b.11.b
Description and scope of the plan implemented | |
Increase floodplain connectivitly along Skinney Creek, page 206, line 29. |
|
|