Ahtanum Creek Restoration Survey and DESIGN 2014
Salmonid Restoration Planning and Assessments
|
14-1222 P | Middle Columbia River | 12/03/2014 | 07/15/2016 | 2014 | Completed | 05/01/2025 | |
| |
Description
The North Yakima Conservation District (NYCD) developed a preliminary design for a stream and floodplain restoration project on Ahtanum Creek in Yakima, WA. Upon application award, NYCD formed a local Technical Working Group, which met on three ocassions to identify and prioritize necessary steps to improve floodplain function and instream habitat for steelhead, Chinook, Coho, and Bull Trout. This group of local biologists, scientists, and natural resource professionals represented a variety of agencies and expertise in the basin. These recovery steps were incorporated into a preliminary design to restore approximately 8,600 feet of stream and 44 acres of floodplain along Ahtanum Creek.
The project presented a unique opportunity to work with several tribal and private landowners and operators to develop a single design to restore properties on both sides of the stream. Prior to this project, this reach of Ahtanum Creek lacked riparian and floodplain function. Riparian condition was poor to fair and channel incision and bank erosion had reduced the quality of salmonid spawning habitat. The partnering agency, Yakama Nation, took the preliminary design developed through this grant to final design and secured funding to implement the project in the fall of 2016.
Project Benefit
Identify and prioritize necessary steps to improve habitat for steelhead, Chinook, Coho, and Bull trout recovery in this area and develop a preliminary design to address priority restoration acitivites.
Funding Details |
PCSRF | $119,133 |
Report Total: | $119,133 |
|
| |
Worksites
1-Ahtanum Creek at 62nd Ave.
- Worksite Identifier: 1-Ahtanum Creek at 62nd Ave.
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Yakima (170300)
- Subbasin:
- Watershed:
- Subwatershed:
- State: Washington
- Recovery Domain: Middle Columbia River
- Latitude: 46.54892265
- Longitude: -120.59657805
ESU
- Mid-Columbia River Spring-run Chinook Salmon ESU
- Middle Columbia River Steelhead DPS
Map
Photos
Metrics
Metrics
- B.0
Salmonid Restoration Planning and AssessmentsY (Y/N)
- . . B.0.a
Planning And Assessment Funding 119,133.00
- . . B.0.b.1
Area Encompassed 300.0
- . . B.0.b.2
Stream Miles Affected 1.60
- . . B.1
Restoration Planning And CoordinationY (Y/N)
- . . . . B.1.a
Planning and Coordination funding 119,133.00
- . . . . B.1.b.8
Conducting habitat restoration scoping and feasibility studiesY (Y/N)
- . . . . . . B.1.b.8.a
Name of plan implemented | |
Yakima Basin Fish & Wildlife Recovery Board. 2009, Yakima Steelhead Recovery Plan, http://www.ybfwrb.org/recovery-planning/steelhead-recovery-plan/ |
- . . . . . . B.1.b.8.b
Description and scope of the plan implemented | |
This project addresses two action items in the 2009 Yakima Steelhead Recovery Plan. Naches Action #27 – Ahtanum Creek floodplain and side channel restoration in which both fish habitat and flood conveyance can be improved. Naches Action #29 – Reduce livestock impacts on Ahtanum Creek riparian areas. |
- . . . . B.1.b.11
Engineering/design work for restoration projectsY (Y/N)
- . . . . . . B.1.b.11.a
Name of plan implemented | |
Yakima Basin Fish & Wildlife Recovery Board. 2009, Yakima Steelhead Recovery Plan, http://www.ybfwrb.org/recovery-planning/steelhead-recovery-plan/
|
- . . . . . . B.1.b.11.b
Description and scope of the plan implemented | |
This project addresses two action items in the 2009 Yakima Steelhead Recovery Plan. Naches Action #27 – Ahtanum Creek floodplain and side channel restoration in which both fish habitat and flood conveyance can be improved. Naches Action #29 – Reduce livestock impacts on Ahtanum Creek riparian areas. |
|
|