Chewuch River Instream Flow Enhancement
Salmonid Habitat Restoration and Acquisition
|
13-1336 R | Upper Columbia River | 12/04/2013 | 10/06/2014 | 2010 | Completed | 05/01/2025 | |
| |
Description
Trout Unlimited Washington Water Projects (TU-WWP) Chewuch River Permanent Instream Flow Enhancement Project was an integrated restoration project in the Methow sub-basin, WRIA 48. This project enhanced flows in the Chewuch River during the low-flow periods of late summer through winter seasons when the river falls below 100 cfs. A combination of water right contracts and extensive irrigation upgrades were used to accomplish the goal of enhanced aquatic habitat for listed fish species in the Chewuch and Methow Rivers. TU-WWPs Chewuch project addressed multiple documented limiting factors to listed salmonids. No water rights were purchased with the project - we only improved the efficiency of the irrigation system which allows the water savings to be enrolled into the Washington Water Trust Program.
Project Benefit
To 10-25 cfs in the Chewuch River by changing the timing of diversions and management of the Chewuch Canal as a result of improved infastructure for the Chewuch Canal. This was a great project for improving usable area and moderating climate change effects into the future for listed species.
Funding Details |
PCSRF | $318,547 |
Other | $1,021,923 |
Report Total: | $1,340,470 |
|
| |
Worksites
1-Chewuch River: CCC Irrigati
- Worksite Identifier: 1-Chewuch River: CCC Irrigati
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Upper Columbia (170200)
- Subbasin:
- Watershed:
- Subwatershed:
- State: Washington
- Recovery Domain: Upper Columbia River
- Latitude: 48.49586069
- Longitude: -120.18074253
ESU
- Upper Columbia River Steelhead DPS
- Upper Columbia River Spring-run Chinook Salmon ESU
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 1,340,469.65
- . . C.0.b
Length of stream treated/protected 9.00
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Upper Columbia Spring Chinook Salmon and Steelhead Recovery Plan 2007 |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.3
Instream Flow ProjectY (Y/N)
- . . . . C.3.a
Instream Flow Funding 1,340,469.65
- . . . . C.3.b
Length of stream 'protected' for adequate flow 9.00
- . . . . C.3.c
Change in water flow10 (cfs)
- . . . . C.3.e.1
Irrigation practice improvementY (Y/N)
- . . . . . . C.3.e.2
Acre feet of water conserved per year1641 (Acre feet)
- . . . . . . C.3.e.3
cfs (cubic feet per second) of water conserved10 (cfs)
- . . . . . . C.3.e.4
Initial start date of action or agreement07/01/2014 (mm/dd/yyyy)
- . . . . . . C.3.e.5
Final end date of action or agreement07/01/2094 (mm/dd/yyyy)
|
|