20-1520 P | - | 09/16/2020 | 06/30/2022 | 2020 | Completed | 05/01/2025 | |
| |
Description
The Middle Nemah Restoration Design Phase 2 project completed design of large wood additions in the upper mainstem of the Middle Nemah River. The road abandonment restoration opportunities and culvert removal were dropped after field review with the sponsor, design firm and DNR staff having determined that these actions would not improve floodplain function significantly; certainly not enough to justify reopening the road system which had been decommissioned well over a decade ago. This also suggested that large wood placements via helicopter would be preferred to avoid reopening the same road system for equipment based wood placements. Wood placements were designed throughout the upper mainstem reaches through a conceptual design process, site visits with stakeholders and development and refinement of the preliminary designs.
PCSRF 2016 funds were spent within the award period.
Project Benefit
The project will produce preliminary designs to increase the quantity and quality of instream and floodplain habitats (i.e., off-channel and over-wintering habitats) by outlining details for large wood placement and road removal actions in the upper Middle Nemah between River for juvenile Coho, Chinook, Chum and Steelhead in the Middle Nemah River.
Funding Details |
PCSRF | $170,109 |
Report Total: | $170,109 |
|
| |
Worksites
1-Middle Nemah Phase 2 Design
- Worksite Identifier: 1-Middle Nemah Phase 2 Design
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Washington Coastal (171001)
- Subbasin:
- Watershed:
- Subwatershed:
- State: Washington
- Recovery Domain:
- Latitude: 46.45432589
- Longitude: -123.80343643
ESU
- Washington Coast Chinook Salmon ESU
- Southwest Washington Coho Salmon ESU
- Pacific Coast Chum Salmon ESU
- Southwest Washington Steelhead DPS
Map
Photos
Metrics
Metrics
- B.0
Salmonid Restoration Planning and AssessmentsY (Y/N)
- . . B.0.a
Planning And Assessment Funding 170,109.00
- . . B.0.b.1
Area Encompassed 94.0
- . . B.0.b.2
Stream Miles Affected 1.90
- . . B.1
Restoration Planning And CoordinationY (Y/N)
- . . . . B.1.a
Planning and Coordination funding 170,109.00
- . . . . B.1.b.11
Engineering/design work for restoration projectsY (Y/N)
- . . . . . . B.1.b.11.a
Name of plan implemented | |
Middle Nemah River Habitat Assessment and Restoration Design. 2020, Camp, R., C. Clark, P. Roni, prepared for Pacific Conservation District, pg. 58,59,72,79-83, 104. |
- . . . . . . B.1.b.11.b
Description and scope of the plan implemented | |
This project is the second design phase to develop plans for restoration of the second, third and fourth highest priority restoration actions identified in the Middle Nemah Habitat Assessment project. |
|
|