Middle Nemah Restoration Phase 2 Design

Salmonid Restoration Planning and Assessments

Restoration Planning And Coordination
Project ID20-1520 P
Recovery Domains -
Start Date09/16/2020
End Date06/30/2022
Year2020
StatusCompleted
Last Edited05/01/2025
 
1 - 1

Description    


The Middle Nemah Restoration Design Phase 2 project completed design of large wood additions in the upper mainstem of the Middle Nemah River. The road abandonment restoration opportunities and culvert removal were dropped after field review with the sponsor, design firm and DNR staff having determined that these actions would not improve floodplain function significantly; certainly not enough to justify reopening the road system which had been decommissioned well over a decade ago. This also suggested that large wood placements via helicopter would be preferred to avoid reopening the same road system for equipment based wood placements. Wood placements were designed throughout the upper mainstem reaches through a conceptual design process, site visits with stakeholders and development and refinement of the preliminary designs.

PCSRF 2016 funds were spent within the award period.

Project Benefit    


The project will produce preliminary designs to increase the quantity and quality of instream and floodplain habitats (i.e., off-channel and over-wintering habitats) by outlining details for large wood placement and road removal actions in the upper Middle Nemah between River for juvenile Coho, Chinook, Chum and Steelhead in the Middle Nemah River.

Accomplishments

Metric Completed Originally
Proposed

Funding Details

SourceFunds
PCSRF$170,109
Report Total:$170,109


Project Map



Worksites

1-Middle Nemah Phase 2 Design    


  • Worksite Identifier: 1-Middle Nemah Phase 2 Design
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Washington Coastal (171001)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Washington
  • Recovery Domain:
  • Latitude: 46.45432589
  • Longitude: -123.80343643

ESU

  • Washington Coast Chinook Salmon ESU
  • Southwest Washington Coho Salmon ESU
  • Pacific Coast Chum Salmon ESU
  • Southwest Washington Steelhead DPS

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding 170,109.00
    •      . . B.0.b.1 Area Encompassed 94.0
    •      . . B.0.b.2 Stream Miles Affected 1.90
    •      . . B.1 Restoration Planning And CoordinationY (Y/N)
      •      . . . . B.1.a Planning and Coordination funding 170,109.00
      •      . . . . B.1.b.11 Engineering/design work for restoration projectsY (Y/N)
        •      . . . . . . B.1.b.11.a
          Name of plan implemented
          Middle Nemah River Habitat Assessment and Restoration Design. 2020, Camp, R., C. Clark, P. Roni, prepared for Pacific Conservation District, pg. 58,59,72,79-83, 104.
        •      . . . . . . B.1.b.11.b
          Description and scope of the plan implemented
          This project is the second design phase to develop plans for restoration of the second, third and fourth highest priority restoration actions identified in the Middle Nemah Habitat Assessment project.