Skookum Creek RM 6.5 Restoration
Salmonid Habitat Restoration and Acquisition
|
20-1090 R | Puget Sound | 09/16/2020 | 12/31/2024 | 2020 | Ongoing | 05/01/2025 | |
| |
Description
This stream and riparian restoration project includes main-stem, riparian, and off-channel treatments along a ~400 foot reach of Skookum Creek at River Mile (RM) 6.5. While gravel abundance is high within the project reach, there are very few wood pieces that provide gravel retention, pool-formation, and other functions. Wood key pieces and wood clusters will be installed to benefit in-stream processes. Portions of the riparian zone are lacking in conifers and native tree cover, instead shrouded by blackberry and other non-native vegetation. This project includes a riparian weed control and planting plan. A network of groundwater channels on the right-bank of the downstream side of Skookum Creek are known to be used by rearing juvenile salmonids however the condition of this off-channel area has been semi-degraded by reed canary grass, lack of native riparian structure, and a lack of floodplain roughness. We propose to remove reed canary grass sod and to place large wood pieces in strategic locations in the floodplain to provide roughness to maintain the groundwater channels. Additional riparian work will include removing blackberry and reed canary grass thickets and planting native trees and shrubs in the floodplain. The collective project treatments will benefit the egg, juvenile, and adult life stages for coho and chum salmon, and cutthroat trout.
Project Benefit
Goals are to increase habitat diversity and complexity. Desired future condition: More edge habitat in main channel, more refugia and cover, less homogeneous sections of main stem, more and/or better off-channel rearing habitat; increase the quantity of wood in the project reach. Desired future condition: More key pieces and more overall pieces. Increase the quantity of and quality of pools. Desired future condition: More pools per lineal distance; more pools maintained by wood.
Accomplishments
Instream Habitat |
Stream Miles Treated |
|
.15 |
Riparian Habitat |
Stream Miles Treated |
|
.50 |
Acres Treated |
|
.1 |
Funding Details |
PCSRF | $74,531 |
State | $191,519 |
Other | $46,950 |
Report Total: | $313,000 |
|
| |
Worksites
1-Skookum RM 6.5
- Worksite Identifier: 1-Skookum RM 6.5
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Puget Sound (171100)
- Subbasin:
- Watershed:
- Subwatershed:
- State: Washington
- Recovery Domain: Puget Sound
- Latitude: 47.09976586
- Longitude: -123.18498053
ESU
- Puget Sound/Strait of Georgia Coho Salmon ESU
- Puget Sound/Strait of Georgia Chum Salmon ESU
- Puget Sound Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding
- . . C.0.b
Length of stream treated/protected
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
|
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding
- . . . . C.4.b
Total length of instream habitat treated
- . . . . C.4.c.1
Channel reconfiguration and connectivityY (Y/N)
- . . . . . . C.4.c.2
Type of change to channel configuration and connectivity (LOV)
- . . . . . . C.4.c.3
Miles of stream treated for channel reconfiguration and connectivity
- . . . . . . C.4.c.4
Miles of off-channel stream created through channel reconfiguration and connectivity
- . . . . . . C.4.c.5
Acres of off-channel or floodplain connected through channel reconfiguration and connectivity
- . . . . . . C.4.c.6
Instream pools created/added through channel reconfiguration and connectivity
- . . . . C.4.d.1
Channel structure placementY (Y/N)
- . . . . . . C.4.d.2
Material used for channel structure (LOV)
- . . . . . . C.4.d.3
Miles of stream treated through channel structure placement
- . . . . . . C.4.d.4
Acres of streambed treated through channel structure placement
- . . . . . . C.4.d.5
Pools expected to be created through channel structure placement
- . . . . . . C.4.d.7
Number of structures placed in channel
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding
- . . . . C.5.b.1
Total riparian miles streambank treated
- . . . . C.5.b.2
Total Riparian Acres Treated
- . . . . C.5.h.1
Riparian plant removal/controlY (Y/N)
- . . . . . . C.5.h.3
Acres of riparian treated for plant removal/control
- . . . . . . C.5.h.4
Miles of streambank treated for riparian plant removal/control
|
|