Skookum Inlet Estuary Restoration
Salmonid Habitat Restoration and Acquisition
|
05-1397 R | - | 02/01/2006 | 08/29/2008 | 2005 | Completed | 05/01/2025 | |
| |
Description
South Puget Sound Salmon Enhancement Group (SPSSEG) used this funding to improve nearshore and freshwater habitat along Skookum Inlet. The project removed several tons of concrete beach armoring and pilings. In addition, the project removed an old stream crossing made with creosoted timbers and replaced it with a 30-foot wooden bridge. This allows better fish passage, stream continuity, and tidal inundation. The old crossing had limited tidal exchange. The project also removed a derelict float, a dock, a tide gate, and debris including creosote, timber, concrete, and garbage to restore tidal water to the upstream habitat. Large woody material and native vegetation (about 750 plants) were added to the freshwater stream habitat and a small 2-acre wetland/salt marsh area.
This is an important project because of its proximity to Skookum Creek. Many salmon species rely on these small nearshore/freshwater areas for transition to saltwater (especially Chinook and chum). This project will also improve fresh water access for juvenile and adult salmonids. There has been observed chum spawning in this stream yearly. Typically forage fish, coastal cutthroat, coho, and juvenile Chinook use these areas as refuge.
Project Benefit
The goal of the project is to restore estuarine and nearshore conditions and processes in the marine environment. The objective of the project is to restore shoreline habitat diversity and function.
Accomplishments
Estuarine Habitat |
Acres Created |
.5 |
.5 |
Acres Treated |
7.0 |
7.0 |
Fish Passage |
Barriers Removed |
|
|
Miles Opened |
3.00 |
|
Funding Details |
PCSRF | $73,080 |
Other | $13,497 |
Report Total: | $86,576 |
|
| |
Worksites
1-Skookum Estuary Restoration
- Worksite Identifier: 1-Skookum Estuary Restoration
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Puget Sound (171100)
- Subbasin:
- Watershed:
- Subwatershed:
- State: Washington
- Recovery Domain:
- Latitude: 47.13165244
- Longitude: -123.07734466
ESU
- Puget Sound/Strait of Georgia Chum Salmon ESU
- Puget Sound Chinook Salmon ESU
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 86,575.88
- . . C.0.b
Length of stream treated/protected .20
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Mason Conservation District 3 year workplan |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.2
Fish Passage ImprovementY (Y/N)
- . . . . C.2.a
Fish Passage Funding 43,289.30
- . . . . C.2.b.1
Length of stream made accessible 3.00
- . . . . C.2.b.4
Number of blockages/impediments/barriers impeding passage 1
- . . . . C.2.g.1
Bridge installed or improved at road stream crossingY (Y/N)
- . . . . . . C.2.g.2
Number of bridges installed or improved/upgraded 1
- . . . . . . C.2.g.3
Miles of stream made accessible by bridge installation or improvement/upgrade 3.00
- . . C.9
Estuarine/Nearshore ProjectY (Y/N)
- . . . . C.9.a
Estuarine/nearshore funding 43,286.58
- . . . . C.9.b
Total amount of estuarine/nearshore area treated 7.0
- . . . . C.9.c.1
Channel modificationY (Y/N)
- . . . . . . C.9.c.3
Acres of estuary treated .6
- . . . . C.9.e.1
Tidegate alteration/removalY (Y/N)
- . . . . . . C.9.e.2
Tidegates altered/removed to allow fish passage 1
- . . . . . . C.9.e.3
Acres opened to fish passage 3.2
- . . . . C.9.j.1
Estuarine plant removal/controlY (Y/N)
- . . . . . . C.9.j.2
Species (Scientific) name(s) of estuarine plants removed | |
Phalaris arundinacea (Reed Canary Grass) |
- . . . . . . C.9.j.3
Acres of estuary treated 2.0
- . . . . C.9.k.1
Shoreline armor removal or modificationY (Y/N)
- . . . . . . C.9.k.2
Miles of shoreline treated 1.00
- . . . . . . C.9.k.3
Acres of shoreline treated 3.2
- . . . . C.9.n.1
Debris removalY (Y/N)
- . . . . . . C.9.n.2
Acres treated .4
- . . . . C.9.q.1
Creation of new estuarine area Y (Y/N)
- . . . . . . C.9.q.2
Acres of estuary created .5
|
|